Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC KAMBAINALLUR | KAMBAINALLUR | DHARMAPURI | TAMIL NADU | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.1 L+₹11,605.55 (2.95%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
9 Mar 2024, 3:00 pmClosed
Block Development Officer(VP), Kadathur
Block Development Officer(VP), Kadathur
Improvements to the Burial ground at Kotrapatti Cremination shed H/O Santhapatti
2024_RDTN_437048_1
Roc.No.2263/2024/E3(P33) AGAMT-II-2024-25
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Kadathur
Can be seen in the Tender Documents
3 documents required · 3 mandatory
₹0
₹4,000
18 May 2024
3 Mar 2024
9 Mar 2024
3 Mar 2024
9 Mar 2024
3 Mar 2024
Amount
Improvements to the Burial Ground at Kottrapatti cremination shed H/O Santhapatti
1. Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial 1 lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) upto 0.30m depth
2. Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all 4 materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
3. Cement mortar 1:2:4 mix using 20mm ISS metal including cost and conveyance of all 5 materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
4. Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all 6 materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
5 CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RC C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded 7 with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
6 Supply and erecting of Steel including all charges Steel As per Design
7. Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and 10 conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
8. Plastering in CM 1:3 mix using 10mm thick including cost and conveyance of all materials 11 to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
9. Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials 12 to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
10. Painting Two Coat of New Plastered wall surface with ready mixed plastic emulsion 14 including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.SELVARAJ
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .