| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-Finance | ₹8.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.2 L+₹10,728.57 (1.32%)Rejected-Finance | ₹8.2 L+₹10,728.57 (1.32%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.3 L+₹19,521.76 (2.40%)Rejected-Finance | ₹8.3 L+₹19,521.76 (2.40%) | L3 | Rejected-Finance L3 |
| 4 | L4₹9.2 L+₹1.1 L (13.4%)Rejected-Finance | ₹9.2 L+₹1.1 L (13.4%) | L4 | Rejected-Finance L4 |
| 5 | L5₹9.7 L+₹1.6 L (19.9%)Rejected-Finance | ₹9.7 L+₹1.6 L (19.9%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHRI KANT MISHRA CONTRACTOR L3 | LALTA PRASAD MAURYA L8 | MAA LAXMI TRADERS L7 | AMRENDRA KUMAR TRIPATHI L4 | Rakesh Kumar Tripathi Contractor And Supplier L9 | M/S SHRI BALA JI CONSTRUCTION L1 | M/S PRASHANT SINGH CONTRACTOR (PRO PRASHANT SINGH) L5 | MOH DARGAHI L6 | RAJESH KUMAR MISHRA L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work by transport earth up to 1 km.including excavation loading unloanding & manual compaction and dressing etc required for proper complection of work as per direction of engineer incharge. | 777.3 | Cum. | 80 ₹62,184 | 150 ₹1,16,595 | 157.9 ₹1,22,735.67 | 142.87 ₹1,11,052.85 | 92.8 ₹72,133.44 | 30 ₹23,319 Lowest | 151.11 ₹1,17,457.8 | 60 ₹46,638 | 72 ₹55,965.6 |
| 2.00 | Dry brick on edge soling with first Class brick and prepration of sub grade and joints filled with local sand or sandy soil, including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 187.5 | Sqm | 396 ₹74,250 | 460 ₹86,250 | 462.68 ₹86,752.5 | 418.63 ₹78,493.13 | 560 ₹1,05,000 | 567.71 ₹1,06,445.63 | 442.76 ₹83,017.5 | 520 ₹97,500 | 300 ₹56,250 Lowest |
| 3.00 | Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 4 | No. | 5,430 ₹21,720 | 6,000 ₹24,000 | 6,321.94 ₹25,287.76 | 5,720 ₹22,880 | 5,000 ₹20,000 | 2,000 ₹8,000 Lowest | 6,049.68 ₹24,198.72 | 3,000 ₹12,000 | 2,000 ₹8,000 Lowest |
| 4.00 | Earth work in excavation in foundation of masonry work in all type of soil including all lead and lift with disposal of earth required for proper complection of work as per direction of engineer incharge | 245.3 | Cum. | 63 ₹15,453.9 | 75 ₹18,397.5 | 73.35 ₹17,992.76 | 66.37 ₹16,280.56 | 50 ₹12,265 | 20 ₹4,906 Lowest | 70.19 ₹17,217.61 | 20 ₹4,906 Lowest | 45 ₹11,038.5 |
| 5.00 | Laying P.C.C. M-10 (1:3:6) mix. in foundation with Kabrai crushed stone grite 4.75 mm to 40 mm size & coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work,Work done as per direction of E/I. | 6.87 | Cum. | 8,485 ₹58,291.95 Lowest | 10,000 ₹68,700 | 9,878.81 ₹67,867.42 | 8,938.21 ₹61,405.5 | 10,000 ₹68,700 | 12,121.26 ₹83,273.06 | 9,453.37 ₹64,944.65 | 12,100 ₹83,127 | 11,000 ₹75,570 |
| 6.00 | Laying R.C.C. M-20 (1:1.5:3) mix with Kabrai crushed stone grit graded 4.75 to 20 mm size with coarse sand of F.M. not less then 2.0; including all cost of material, labour T & P etc. required for proper complection of work as per direction of engineer incharge | 28.36 | Cum. | 8,960 ₹2,54,105.6 Lowest | 10,500 ₹2,97,780 | 10,432.01 ₹2,95,851.8 | 9,438.73 ₹2,67,682.38 | 12,500 ₹3,54,500 | 12,800.01 ₹3,63,008.28 | 9,982.73 ₹2,83,110.22 | 12,800 ₹3,63,008 | 12,000 ₹3,40,320 |
| 7.00 | Centering and shuttering for R.C.C.work; including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 110.06 | Sqm | 910 ₹1,00,154.6 | 1,100 ₹1,21,066 | 1,059.5 ₹1,16,608.57 | 958.62 ₹1,05,505.72 | 1,050 ₹1,15,563 | 50 ₹5,503 Lowest | 1,013.87 ₹1,11,586.53 | 1,300 ₹1,43,078 | 700 ₹77,042 |
| 8.00 | Cutting, bending, binding and placing of steel reinforcementin R.C.C. work; including all, cost of steel, binding wire,labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 2.31 | MT | 57,325 ₹1,32,420.75 Lowest | 80,000 ₹1,84,800 | 66,742.33 ₹1,54,174.78 | 60,387.48 ₹1,39,495.08 | 80,850 ₹1,86,763.5 | 81,892.43 ₹1,89,171.51 | 63,867.91 ₹1,47,534.87 | 81,500 ₹1,88,265 | 71,000 ₹1,64,010 |
| 9.00 | Earth work in back filling of foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 84.63 | Cum | 53 ₹4,485.39 | 60 ₹5,077.8 | 61.12 ₹5,172.59 | 55.31 ₹4,680.89 | 50 ₹4,231.5 | 15 ₹1,269.45 Lowest | 58.49 ₹4,950.01 | 75 ₹6,347.25 | 50 ₹4,231.5 |
| 10.00 | Dismantling of old & damaged brick on edge soling and stacking of brick as per direction of engineer-in-charge;including all cost of labours, T & P etc. required for proper complection of work as per direction of engineer incharge | 187.5 | Sqm. | 13 ₹2,437.5 | 12 ₹2,250 | 11.73 ₹2,199.38 | 10.62 ₹1,991.25 | 11 ₹2,062.5 | 7 ₹1,312.5 Lowest | 11.23 ₹2,105.63 | 14 ₹2,625 | 10 ₹1,875 |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
28 Jul 2026, 5:00 pmClosed
EE Saryu Nahar Khand-1 Balrampur
EE Saryu Nahar Khand-1 Balrampur
CONSTRUCTION OF R.C.C CULVERT AT KM 17.700 OF MAHADEIYA DY.
2026_UPIDC_1171159_5
01/EE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹25,000
Yes
14 Aug 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
28 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work by transport earth up to 1 km.including excavation loading unloanding & manual compaction and dressing etc required for proper complection of work as per direction of engineer incharge. | 1 | Cum. | - | - |
| 2 | Dry brick on edge soling with first Class brick and prepration of sub grade and joints filled with local sand or sandy soil, including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | - | Sqm | - | - |
| 3 | Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | - | No. | - | - |
| 4 | Earth work in excavation in foundation of masonry work in all type of soil including all lead and lift with disposal of earth required for proper complection of work as per direction of engineer incharge | - | Cum. | - | - |
| 5 | Laying P.C.C. M-10 (1:3:6) mix. in foundation with Kabrai crushed stone grite 4.75 mm to 40 mm size & coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work,Work done as per direction of E/I. | - | Cum. | - | - |
| 6 | Laying R.C.C. M-20 (1:1.5:3) mix with Kabrai crushed stone grit graded 4.75 to 20 mm size with coarse sand of F.M. not less then 2.0; including all cost of material, labour T & P etc. required for proper complection of work as per direction of engineer incharge | 1 | Cum. | - | - |
| 7 | Centering and shuttering for R.C.C.work; including all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 110.06 | Sqm | - | - |
| 8 | Cutting, bending, binding and placing of steel reinforcementin R.C.C. work; including all, cost of steel, binding wire,labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 2.31 | MT | - | - |
| 9 | Earth work in back filling of foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. required for proper complection of work as per direction of engineer incharge | 84.63 | Cum | - | - |
| 10 | Dismantling of old & damaged brick on edge soling and stacking of brick as per direction of engineer-in-charge;including all cost of labours, T & P etc. required for proper complection of work as per direction of engineer incharge | - | Sqm. | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_2198309.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .