Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | ₹19.7 L | L1 | Accepted-AOC Bid Accepted Hence L1 Bidder |
| 2 | L2₹19.8 LRejected-AOC | ₹19.8 L | L2 | Rejected-AOC Bid Rejected Hence L2 Bidder |
| Sl No | Description | Qty | Unit | SRI AYEE AMMAN ASSOCIATES L2 | Natpavi Associatess L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of a 2.00 Lakhs litre Capacity Sump at Vengamedu Bus stop at Arasamapalayam H/O Sivanmalai | 1 | nos | - | - |
| 2.00 | Earthwork excavation in sand, silt other loose soil wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc. with an initial lead of 10m and lift of 2m. and as directed by Depatmental Officers. | 246.97 | cum | 270 ₹66,681.90 | 263.7 ₹65,125.99 |
| 3.00 | Filling with clean river sand complying with standard specification including with standard specification including watering ramming and consolidation etc.,complete and as directed by Dept. Officers Sand filling | 13.23 | cum | 1,750 ₹23,152.50 | 1,736.5 ₹22,973.90 |
| 4.00 | Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed by Depatmental Officers. | 13.23 | cum | 5,360 ₹70,912.80 | 5,350.5 ₹70,787.12 |
| 5.00 | Reinforced Cement Concrete M30 using Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by Depatmental Officers. Beyond 1.50 m & upto 4.50 m below GL | 34.68 | cum | 8,930 ₹3.1 L | 8,913.5 ₹3.1 L |
| 6.00 | Reinforced Cement Concrete M30 using Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by Depatmental Officers. | 1 | nos | - | - |
| 7.00 | a.Upto 1.50 m Below GL | 6.83 | cum | 8,785 ₹60,001.55 | 8,775 ₹59,933.25 |
| 8.00 | b.Upto 4.50 m above GL from GL | 21.08 | cum | 8,930 ₹1.9 L | 8,916 ₹1.9 L |
| 9.00 | Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc.,complete and as directed by Depatmental Officers. | 1 | nos | - | - |
| 10.00 | a.For 0.00 to 3.30 M (Plane Surface) | 1.52 | sqm | 1,095 ₹1,664.40 | 1,095 ₹1,664.40 |
Tender Value
₹19.9 L
EMD Value
₹19,910
Closing Date
26 Feb 2026, 3:00 pmClosed
Block development officer (VP), Kangayam
Block development officer (VP), Kangayam
Construction of 200000 lit Capacity Ground level Sump at Vengamedu Bus stop at Arasampalayam H/O Sivanmalai, Kangayam Block,Sivanmalai panchayat , Tiruppur District Unapproved Layout Fund 2025-26
2026_RDTN_665653_1
ROC NO.1802/2025/A2 dt.18.02.2026
Open Tender
Civil Works - Water Works
Block development office (VP), Kangayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹19,910
Yes
Block development office (VP), Kangayam
5 Mar 2026
24 Feb 2026
26 Feb 2026
24 Feb 2026
26 Feb 2026
24 Feb 2026
25 Feb 2026
Construction of a 2.00 Lakhs litre Capacity Sump at Vengamedu Bus stop at Arasamapalayam H/O Sivanmalai
Earthwork excavation in sand, silt other loose soil wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc. with an initial lead of 10m and lift of 2m. and as directed by Depatmental Officers.
Filling with clean river sand complying with standard specification including with standard specification including watering ramming and consolidation etc.,complete and as directed by Dept. Officers Sand filling
Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed by Depatmental Officers.
Reinforced Cement Concrete M30 using Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by Depatmental Officers. Beyond 1.50 m & upto 4.50 m below GL
Reinforced Cement Concrete M30 using Machine crushed HBG stone for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed by Depatmental Officers.
a.Upto 1.50 m Below GL
b.Upto 4.50 m above GL from GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc.,complete and as directed by Depatmental Officers.
a.For 0.00 to 3.30 M (Plane Surface)
b.For 0.00 to 3.30 M (Curved Surface)
c.For 0.00 to 3.30 M (For Round Coloum)
d. For 3.30 to 4.30 M (Plane Surface)
e.For 3.30 M TO 4.30M (Curved Surface)
Supplying, fabricating and placing in position of RTS rods for reinforcement including cost of steel and binding wire, labour charges etc., complete for RCC works and as directed by Depatmental Officers.
Refilling the foundation with excavated Soil (other than sand) in layers of not more than 15cm thick, watering, well ramming, consolidating, complying with standard specification and as directed by Depatmental Officers.
Provision for Work Site Board etc.,
Photograpic charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_799504.xls
BOQ • 0.26 MB
tb.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid