| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.0 CrAdmitted-Finance BARMER | RAJASTHAN | 344001 | +1.11% | ₹14.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹15.8 CrAdmitted-Finance | +14.00% | ₹15.8 Cr | L2 | Admitted-Finance |
Tender Value
₹13.9 Cr
EMD Value
₹27.7 L
Closing Date
20 May 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Development of Four Lane Road from Piprali Village to Piprali Circle, Sikar (Km. 114/00 to 118/500) on Kotputli Sikar Kuchaman Road (SH 37B, SH 8A, SH 92, SH 07)
2026_RSRDC_558023_1
RSRDCC NIT 079/2026-27 Dated 08.05.2026
Open Tender
Civil Works - Roads
240 days
Kotputli Sikar Kuchaman Road (SH 37B, SH 8A, SH 92
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹11,800
PD RSRDC UNIT SIKAR THROUGH NEFT/RTGS/IMPS
₹27.7 L
PD RSRDC UNIT SIKAR
25 May 2026
11 May 2026
21 May 2026
11 May 2026
20 May 2026
13 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A: BT Road work | 0 | Hectare | 0 | ₹0 |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material up to a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MoRTH specification clause 201 | 0 | Hectare | 0 | ₹0 |
| 3 | By mechanical Means. | 0 | Hectare | 0 | ₹0 |
| 4 | In areas of non-thorny jungle | 7.65 | Ha | 12,513 | ₹95,724.45 |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 29,750 | Cum | 31 | ₹9,22,250 |
| 6 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 29,750 | Cum | 40 | ₹11,90,000 |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50m as per MoRTH Specification Clause 305.3 | 13,125 | Cum | 59 | ₹7,74,375 |
| 8 | Construction of Granular sub base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORTH Specification Clause 401.For Grading III Material | 2,025 | Cum | 450 | ₹9,11,250 |
| 9 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with notor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S. 2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete [MoRTH specification : Clause
401]. By Mechanical means.For Grading II Material | 10,062.5 | Cum | 859 | ₹86,43,687.5 |
| 10 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.By Mechanical Means with all leads | 17,850 | Cum | 1,147 | ₹2,04,73,950 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
AccountDetails.pdf
Tender Documents • 0.22 MB
SBD_PIPRALI.pdf
Tender Documents • 1.13 MB
Various_Act_Circulars_Orders_Notification30.pdf
Tender Documents • 0.86 MB
BOQ_993567.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid