| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹10.0 L+₹2,859.25 (0.29%)Rejected-Finance | L2 | Rejected-Finance Highest |
Tender Value
₹12.6 L
EMD Value
₹12,570
Closing Date
24 May 2023, 3:00 pmClosed
Block Development Officer (BP)
Block Development Office, Pattukkottai
Thanjavur District Pattukkottai Block Kondikum Panchayat Renovation of School buildings undr SIDS 2022 23 Package 9 Tender Notice
2023_RDTN_316225_1
5634/2022/A6
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Pattukkottai
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹12,570
Yes
25 May 2023
17 May 2023
24 May 2023
17 May 2023
24 May 2023
17 May 2023
Amount
Part 1 Renovation of at PUE school Building at Kondikulam Habitation in Kondikulam Panchayat (west facing ) .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Dismantling One Course of Pressed Tile in cement mortar and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Dismantling the exixting damaged door and windows including all labour charges etc., complete
Repairs to steel Doors including all labour charges etc., complete
Repairs to steel Windows including all labour charges etc., complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:3 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers - 30 % of New Tiles
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Black board Painting two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Supplying and fixing PVC Rainwater Down fall pipe of 110mm dia with necessary shoes bends & clamps etc
Teachers cupboard
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing of cuddappah slab 20/30 thick
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Providing cup board shutter frame using termite/water proof plywood of 19mm thick over which laminated of the shutter etc completed
Lunch box cupboard
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Supplying and fixing of cuddappah slab 20/30 thick
chappal Rack
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Supplying and fixing of cuddappah slab 20/30 thick
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Sand filling with good quality M.sand including cost and conveyance of all materials and all labour charges for etc completed.
Filling of 40mm ISS HBG metal inclding cost nad conveyance of Materials to site and all other labour etc completed.
Filling of 20mm ISS HBG metal inclding cost nad conveyance of Materials to site and all other labour etc completed.
Cost and supply of RCC 900mm dia rings &cover including all charges etc
600mm dia RCC rings
600mm dia RCC cover
Supplying and fixing PVC Rainwater Down fall pipe of 110mm dia with necessary shoes bends & clamps etc
Electrification
Light point SD 25
Fan Point SD 25
Plug point SD 25
LED Light fitting
Support for Mains SD 69
Serivice connection
TNEB Meter board
Provision for Hand rails
Part 2 Renovation of at PUE school Building at Kondikulam Habitation in Kondikulam Panchayat (south facing ) .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Dismantling PCC and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Dismantling One Course of Pressed Tile in cement mortar and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Dismantling the exixting damaged door and windows including all labour charges etc., complete
Repairs to steel Door etc including all labour charges etc., complete
Repairs to steel Window etc including all labour charges etc., complete
Cost and supply of New Steel Window etc including all labour charges etc., complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Plastering with Cement Mortar 1:3 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers - 15 % of New Tiles
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Painting over New iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Black board Painting two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Supplying and providing 1000liters capacity priming tank made up to PVC make sintex/equivalent
Supplying and fixing PVC Rainwater Down fall pipe of 110mm dia with necessary shoes bends & clamps etc
Teachers cupboard
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Supplying and fixing of cuddappah slab 20/30 thick
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Providing cup board shutter frame using termite/water proof plywood of 19mm thick over which laminated of the shutter etc completed
Lunch box cupboard
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Supplying and fixing of cuddappah slab 20/30 thick
chappal Rack
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Supplying and fixing of cuddappah slab 20/30 thick
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20A
Sand filling with good quality M.sand including cost and conveyance of all materials and all labour charges for etc completed.
Filling of 40mm ISS HBG metal inclding cost nad conveyance of Materials to site and all other labour etc completed.
Filling of 20mm ISS HBG metal inclding cost nad conveyance of Materials to site and all other labour etc completed.
Cost and supply of RCC 900mm dia rings &cover including all charges etc
600mm dia RCC rings
600mm dia RCC cover
Supplying and fixing PVC Rainwater Down fall pipe of 110mm dia with necessary shoes bends & clamps etc
Electrification
Light point SD 25
Fan Point SD 25
Plug point SD 25
LED Light fitting
Support for Mains SD 69
Serivice connection
TNEB Meter board
LED Light
Provision for Hand rails
Part 3 Renovation of at PUE school Girls Toilet at Kondikulam Habitation in Kondikulam Panchayat .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers - 100 % of New Tiles
Repairs to steel doors including all labour charges etc., complete
White washing with best shell lime in two coats including all labour charges
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Painting over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Part 4 Renovation of at PUE school Boys Toilet at Kondikulam Habitation in Kondikulam Panchayat .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Paving the floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance all materials and labour charges etc., complete
Dadooing walls with glazed tiles of size 305x305x6mm thick including cost and conveyance all materials and labour charges etc., complete
cost and supplying steel doors including all labour charges etc., complete
White washing with best shell lime in two coats including all labour charges
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Painting over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
cost and supply of Water Supply
20mm dia PVC pipe
20mm dia PVC bend
20mm dia PVC Tap
Part 5 Renovation of at PUE school Kitchen shed at Kondikulam Habitation in Kondikulam Panchayat .
Clean removal of Cement plaster from walls and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Dismantling One Course of Pressed Tile in cement mortar and clearing away from the site including cost and conveyance all materials and labour charges etc., complete
Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers - 100 % of New Tiles
Repairs to steel doors an Windows including all labour charges etc., complete
Window
White washing with best shell lime in two coats including all labour charges
Distembering two coats with best approved colour with Priming Coat over the Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary etc completed
Painting the wall two coats with approved weather proof Exterior Emulsion paint/ over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Painting over old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Cost and supply of New Steel Window etc including all labour charges etc., complete
Electrification
Fan Point SD 25
LED Light
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A SENTHILNATHAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .