Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC VILL SALKA PO KHANDAGRAM BIRBHUM | BIRBHUM | WEST BENGAL | 713129 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.0 L+₹88.72 (0.03%)Rejected-Finance VILL MURANDIHI ILLAMBAZAR DIST BIRBHUM | BIRBHUM | WEST BENGAL | 713129 | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.0 L+₹147.86 (0.05%)Rejected-Finance WEST BENGAL | HOWRAH | WEST BENGAL | 711101 | L3 | Rejected-Finance L3 |
Tender Value
₹3.0 L
EMD Value
₹5,920
Closing Date
19 Dec 2025, 12:00 pmClosed
BDO
ILLAMBAZAR BIRBHUM
Fencing and Repairing work at Salka Primary School under Booth No. 41 Shalka Part Basic School of Sirsha G.P. within Illambazar Panchayat Samity. Scheme Id APAS 01 286 41 0001
2025_ZPHD_957080_6
Illambazar/ENIT-14/25-26
Open Tender
Miscellaneous Works
Percentage
ILLAMBAZAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
₹5,920
7 Feb 2026
22 Nov 2025
22 Dec 2025
22 Nov 2025
19 Dec 2025
22 Nov 2025
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof.
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof.
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
(a) Supplying, fitting galvanised 3 ply 12 gauge / 4 points line of barbed wire in fencing (holes already made in the body of the post) or fixed by staples tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping joints in the wire as necessary but excluding the cost of galvanised staples,straining bolt and binding wire where necessary.
Labour for fitting line of wire to posts, tightening by straining bolts and fixing the wire ( in taut condition) to the post with staples (including the cost of cutting and lapping joints in the wire, as necessary and including the cost of staples and straining bolts and also the labour for fixing the staples but excluding the cost of straining bolts) (d) Barbed wire
M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to rafter of trusses with necessary bolts, nuts, washer or screws etc. (length of straight not less than 230 mm)
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 15 mm thick plaster
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. In Ground floor: (iii) Two coats.
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (iii) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth.
Signage of work with 3 stage photo…….. All complete
Add GST ….... @ 18.00 %
Add Labour Welfare, Cess ….... @ 1.00 %
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
NOTICE.pdf
Tender Documents • 1.89 MB
technicalBID.pdf
Tender Documents • 0.56 MB
BOQ_2300441.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .