Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.5 LAccepted-AOC | ₹15.5 L Quoted ₹12.8 L | 1 | Accepted-AOC Work Order |
| 2 | 2₹12.8 L+₹2,800.50 (0.22%)Rejected-Finance | ₹12.8 L+₹2,800.50 (0.22%) | 2 | Rejected-Finance Highest Amount Quoted |
| 3 | 0Rejected-Finance | - | 0 | Rejected-Finance Technically Rejected |
| Sl No | Description | Qty | Unit | P SANNASI L2 | R.Tamilselvan L1 | M/s PRS Construction L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Meters and clearing and leveling the site etc. complete complying with standard specification. | 33 | 1m3 (One Cubic Metre) | 395.5 ₹13,051.5 | 340 ₹11,220 Lowest | 396 ₹13,068 |
| 2.00 | Cement concrete 1:4:8 (One cementFour sand and Eight aggregate) using 40mm gauge ISS jelly for foundation and flooring including all cost of labour and materials at site, mixing concrete, laying, ramping, curing, etc complete and dewatering if found necessary and laid in layers of not more than 15cm thick etc. complete complying with standard specification. | 6 | 1m3 (One Cubic Metre) | 7,842 ₹47,052 Lowest | 7,842.25 ₹47,053.5 | 7,845 ₹47,070 |
| 3.00Providing and erecting centring for sides and soffits including supports and strutting for the following items detailed below with all cross bracing using 10 gauge mild steel sheets of size 90cm x 60 cm and stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 5cm and spaced about 90cm center to center and supported by casurina props of 10cm to 13cm dia spaced at 75cm center to centre etc. complete complying with standard specification | ||||||
| 3.01 | Square column | 32 | 1m3 (One Cubic Metre) | 854 ₹27,328 | 820 ₹26,240 Lowest | 855 ₹27,360 |
| 3.02 | Gradebeam | 28 | 1m3 (One Cubic Metre) | 938 ₹26,264 | 900 ₹25,200 Lowest | 940 ₹26,320 |
| 3.03 | Plain surface | 83.5 | 1m3 (One Cubic Metre) | 1,310 ₹1,09,385 Lowest | 1,500 ₹1,25,250 | 1,310 ₹1,09,385 Lowest |
| 4.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel grills for all RCC works as per the design given including cost of steel, binding wire and all labour charges etc. complete complying with standard specification | 2,000 | 1m (One Kilo gram) | 111 ₹2,22,000 | 102 ₹2,04,000 Lowest | 112 ₹2,24,000 |
| 5.00Cement concrete 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification | ||||||
| 5.01 | Upto Basement | 10 | 1m³ (One Cubic Metre) | 11,065 ₹1,10,650 Lowest | 11,065 ₹1,10,650 Lowest | 11,070 ₹1,10,700 |
| 5.02 | Above Basement | 10 | 1m³ (One Cubic Metre) | 11,206 ₹1,12,060 | 11,201 ₹1,12,010 Lowest | 11,210 ₹1,12,100 |
Tender Value
Refer Docs
EMD Value
₹15,500
Closing Date
10 Mar 2026, 3:00 pmClosed
Executive Officer
Townpanchayat Office, Highwavys, Theni District
Construction of Passenger shelter at Ward 5 Near Tea Estate weight shed in Highways Town Panchayat
2026_DTP_670022_1
194/2025
Open Tender
Civil Works
Works
Townpanchayat Office, Highwavys, Theni District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,500
Townpanchayat Office, Highwavys, Theni District
13 Jul 2026
4 Mar 2026
11 Mar 2026
4 Mar 2026
10 Mar 2026
4 Mar 2026
5 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Meters and clearing and leveling the site etc. complete complying with standard specification. | 33 | 1m3 (One Cubic Metre) | - | - |
| 2 | Cement concrete 1:4:8 (One cementFour sand and Eight aggregate) using 40mm gauge ISS jelly for foundation and flooring including all cost of labour and materials at site, mixing concrete, laying, ramping, curing, etc complete and dewatering if found necessary and laid in layers of not more than 15cm thick etc. complete complying with standard specification. | 6 | 1m3 (One Cubic Metre) | - | - |
| 3Providing and erecting centring for sides and soffits including supports and strutting for the following items detailed below with all cross bracing using 10 gauge mild steel sheets of size 90cm x 60 cm and stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 5cm and spaced about 90cm center to center and supported by casurina props of 10cm to 13cm dia spaced at 75cm center to centre etc. complete complying with standard specification | |||||
| 3.01 | Square column | 32 | 1m3 (One Cubic Metre) | - | - |
| 3.02 | Gradebeam | 28 | 1m3 (One Cubic Metre) | - | - |
| 3.03 | Plain surface | 83.5 | 1m3 (One Cubic Metre) | - | - |
| 4 | Supplying, fabricating and placing in position mild steel or ribbed tor steel grills for all RCC works as per the design given including cost of steel, binding wire and all labour charges etc. complete complying with standard specification | 2,000 | 1m (One Kilo gram) | - | - |
| 5Cement concrete 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification | |||||
| 5.01 | Upto Basement | 10 | 1m³ (One Cubic Metre) | - | - |
| 5.02 | Above Basement | 10 | 1m³ (One Cubic Metre) | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.40 MB
BOQ_805184.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .