| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.9 LAccepted-AOC AT BHAIRABI SAHI PO TALCHER TOWN PS TALCHER DIST ANGUL 759107 | TALCHER | ANGUL | ODISHA | 759107 | ₹82.9 L Quoted ₹70.4 L | L1 | Accepted-AOC ACCEPTED BEING L1 EXCEPT ALL OTHER BIDDERS |
| 2 | L2₹71.2 LRejected-Finance AT PO VERUBANIA KANKILI TALCHER DIST ANGUL ODISHA | TALCHER | ANGUL | ODISHA | ₹71.2 L | L2 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 3 | L3₹77.2 LRejected-Finance AT BADAJORADA TALCHER ANGUL ODISHA 759103 | ANUGUL | ODISHA | 759103 | ₹77.2 L | L3 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 4 | L4₹81.3 LRejected-Finance ANANTA OCP JAGANNATH AREA | ANUGUL | ODISHA | 759103 | ₹81.3 L | L4 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 5 | L5₹81.9 LRejected-Finance AT SUSUDA PO ANKULA DIST ANGUL ODISHA 759132 | ANUGUL | ODISHA | 759132 | ₹81.9 L | L5 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
Tender Value
₹1.4 Cr
EMD Value
₹1.8 L
Closing Date
2 Feb 2026, 5:00 pmClosed
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Providing and fixing M.S Boards (different sizes) at different places of Ananta OCP under Jagannath Area.
2026_MCL_350775_1
MCL/GM(JA)/SO(C)/e- Tender/25-26/94, Dtd-07/01/26
Open Tender
Civil Works - Others
120 days
ANANTA OCP
AS PER NIT
5 documents required · 5 mandatory
₹1.8 L
29 May 2026
9 Jan 2026
4 Feb 2026
10 Jan 2026
2 Feb 2026
10 Jan 2026
10 Jan 2026 - 26 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with River sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:1.5%:3 (1 Cement: 1.5% coarse sand (zone-lll) derived lrom natural sources :3graded stone aggregate 20 mm nominalsize derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars
Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Providing and fixing Vinyl Sticker(1.024 mm thick)including cost of all materials and labour as per the instruction of engineer in charge.
Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. (b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4 mm thick aluminium composite panel material consisting of 3 mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5 mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. (c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium items. The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 1.55 MB
BOQ_363527.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid