Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 CrAdmitted-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹21.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹36.8 Cr+₹15.1 Cr (69.5%)Admitted-Finance A 8 GREEN PARK NEW DELHI 110016 INDIA | NEW DELHI | SOUTH DELHI | DELHI | 110016 | ₹36.8 Cr+₹15.1 Cr (69.5%) | L2 | Admitted-Finance |
| 3 | L3₹39.5 Cr+₹17.8 Cr (82.2%)Admitted-Finance 1ST FLOOR YMCA CULTURAL CENTER CUM LIBRARY BUILDING 1 JAI SINGH ROAD NEW DELHI 110001 INDIA | NEW DELHI | NEW DELHI | DELHI | 110001 | ₹39.5 Cr+₹17.8 Cr (82.2%) | L3 | Admitted-Finance |
| 4 | L4₹41.0 Cr+₹19.3 Cr (89.0%)Admitted-Finance | ₹41.0 Cr+₹19.3 Cr (89.0%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Intercontinental Consultants and Technocrats Pvt. Ltd. L2 | RODIC CONSULTANTS PVT. LTD. L3 | RITES Limited L1 | YUKSEL PROJE A.S. L4 |
|---|---|---|---|---|---|---|---|
| 1.00A. KEY PROFESSIONALS | |||||||
| 1.01 | Team Leader Cum SeniorTunnel Expert (1 No) | 48 | Month | 3,50,000 ₹1,68,00,000 | 8,75,000 ₹4,20,00,000 | 2,20,000 ₹1,05,60,000 Lowest | 9,00,000 ₹4,32,00,000 |
| 1.02 | Resident Engineer cum Tunnel Excavation Expert (1 No) | 156 | Month | 2,50,000 ₹3,90,00,000 | 4,15,000 ₹6,47,40,000 | 2,10,000 ₹3,27,60,000 Lowest | 4,50,000 ₹7,02,00,000 |
| 1.03 | Tunnel Design Engineer (1 No) | 42 | Month | 1,50,000 ₹63,00,000 Lowest | 7,15,000 ₹3,00,30,000 | 1,50,000 ₹63,00,000 Lowest | 4,95,600 ₹2,08,15,200 |
| 1.04 | Bridge/Structural Engineer | 48 | Month | 1,50,000 ₹72,00,000 Lowest | 2,25,000 ₹1,08,00,000 | 2,10,000 ₹1,00,80,000 | 3,50,000 ₹1,68,00,000 |
| 1.05 | Tunnel Safety Expert (1 No) | 42 | Month | 2,60,000 ₹1,09,20,000 | 8,80,000 ₹3,69,60,000 | 2,00,000 ₹84,00,000 Lowest | 5,30,000 ₹2,22,60,000 |
| 1.06 | Senior Geotechnical Expert (1 No) | 42 | Month | 2,60,000 ₹1,09,20,000 | 3,65,000 ₹1,53,30,000 | 2,00,000 ₹84,00,000 Lowest | 4,11,765 ₹1,72,94,130 |
| 1.07 | Senior Geologist (1 No) | 42 | Month | 1,60,000 ₹67,20,000 Lowest | 3,05,000 ₹1,28,10,000 | 3,08,000 ₹1,29,36,000 | 2,70,000 ₹1,13,40,000 |
| 1.08 | Senior Quality cum Material Expert (1 No) | 42 | Month | 1,50,000 ₹63,00,000 Lowest | 2,00,000 ₹84,00,000 | 2,25,000 ₹94,50,000 | 2,90,000 ₹1,21,80,000 |
| 1.09 | Senior Contract specialist (1 No) | 24 | Month | 50,000 ₹12,00,000 Lowest | 5,50,000 ₹1,32,00,000 | 2,50,000 ₹60,00,000 | 1,88,235 ₹45,17,640 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
6 Mar 2024, 3:00 pmClosed
Mohammad Khalid
NHIDCL HQ New Delhi
Consultancy Services as AE for Supervision of Construction of Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km and its approaches of 2.1 km from km 10.600 to km 15.200 (P-2) on Sairang - Phaibawk section of NH-6 in the Mizoram
2023_NHIDC_785075_1
NHIDCl/Miz/AE/NH06/ABTP2/23
Open Tender
Civil Works
Item Rate
1096 days
Mizoram
As per Tender Documents
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ New Delhi
28 Jan 2025
13 Dec 2023
7 Mar 2024
13 Dec 2023
6 Mar 2024
24 Feb 2024
13 Dec 2023 - 8 Jan 2024
8 Jan 2024
Amount
A. KEY PROFESSIONALS
Team Leader Cum SeniorTunnel Expert (1 No)
Resident Engineer cum Tunnel Excavation Expert (1 No)
Tunnel Design Engineer (1 No)
Bridge/Structural Engineer
Tunnel Safety Expert (1 No)
Senior Geotechnical Expert (1 No)
Senior Geologist (1 No)
Senior Quality cum Material Expert (1 No)
Senior Contract specialist (1 No)
B. SUB PROFESSIONALS
Tunnel ventilation Cum E&M Expert
Assistant Bridge/Structural Engineer (1Nos. during construction and 1 nos during DLP)
Instrumentation & Control Expert (SCADA)
Tunnel Engineer (2Nos. during construction and 2 nos during DLP)
Tunnel Excavation Expert (1Nos. during construction and 1 nos during DLP)
Tunnel Lining (1 Nos. during construction and 1 nos during DLP)
Geologist (1Nos. during construction and 1 nos during DLP)
Quantity Surveyor (2 Nos. during construction and 1 nos during DLP)
Assistant Highway Engineer (1 no during Construction and DLP)
Assistant Quality cum material Engineer (1 Nos. During construction and 1 nos during DLP)
Safety Engineer (2Nos. during construction and 1 nos. during DLP)
Environmental Engineer
Survey Engineer (2Nos. during construction and 1 nos. during DLP)
CAD Expert (1Nos. during construction and 1 nos. during DLP)
Lab Technician (1Nos. during construction and 1 nos. during DLP)
Office Rent ( During construction and DLP)
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Accountant Cum Cashier (1 No)
Steno cum Computer operator (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Scorpio or equivalent 4x4 vehicle(not more than 2 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)
Bolero or equivalent 4x4 vehicle(not more than 2 years old) (3 nos during Construction Period and 2 nos during Maintenance Period.)
Duty Travel to Site (Fixed Costs) (For all Lengths of projects) : Professional and Sub-Professional Staff. The employer may require the Key Personnel to visit the Employer’s HQ office or any other office as per direction. The quoted amount should include travel fare for 80 round trip per key personnel to Employer’s Head Office for two working days (including Air fare, Food, Boarding & Lodging charges, TA/DA, Taxi, etc. Complete).
All Trips
Office Supplies, Utilities and Communication (Fixed Costs):Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication including Internet connection
During Construction Period
During Maintenance Period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc
During Construction Period
During Maintenance Period
Reports and Document (Fixed costs)
Monthly Report
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (4.6 kms x 8 times)
Pavement strength measurement using FWD (4.6 kms x 4 times)
Bridge inspection using Mobile Bridge Inspection Unit (4.6kms x 8 times)
Road signs inspection using Retro Reflectometer (4.6 kms x 8 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Intercontinental Consultants and Technocrats Pvt. Ltd. (BID ID -2975052)
RODIC CONSULTANTS PVT. LTD. (BID ID -2980576)
YUKSEL PROJE A.S. (BID ID -2979805)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .