| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.6 CrAccepted-AOC | ₹2.6 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.6 Cr+₹67,652.30 (0.26%)Rejected-Finance | ₹2.6 Cr+₹67,652.30 (0.26%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.7 Cr+₹9.2 L (3.53%)Rejected-Finance | ₹2.7 Cr+₹9.2 L (3.53%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹2.7 Cr+₹13.2 L (5.03%)Rejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹2.7 Cr+₹13.2 L (5.03%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹2.9 Cr+₹26.8 L (10.2%)Rejected-Finance | ₹2.9 Cr+₹26.8 L (10.2%) | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | S.P.R.U INFRATECH PRIVATE LIMITED L7 | M/S CHAUDHARY ENTERPRISES L4 | S.B. ENTERPRISES L3 | M/S RAMPYARE SINGH L1 | M/S LALMANI MAURYA L2 | M/S RADHEY MOHAN DUBEY CONSTRUCTION L5 | NIKHIL CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in sand stone,lime stone or other soft rock mixed with boulder by pick axe including all lead and lift with proper completion of work. | 3,505.15 | M3 | 149 ₹5,22,267.35 | 150 ₹5,25,772.5 | 156 ₹5,46,803.4 | 180 ₹6,30,927 | 175 ₹6,13,401.25 | 160 ₹5,60,824 | 72 ₹2,52,370.8 Lowest |
| 2.00 | Providing and laying Coarse sand in filling for lining work & laying in filter including cost of all materials, labour charges & T&P etc. for proper completion of work. | 874.85 | M3 | 1,678 ₹14,67,998.3 | 2,000 ₹17,49,700 | 2,586 ₹22,62,362.1 | 2,390 ₹20,90,891.5 | 2,350 ₹20,55,897.5 | 2,400 ₹20,99,640 | 850 ₹7,43,622.5 Lowest |
| 3.00 | Preparation of sub grade before laying of lining excluding cost of earth work all materials, labour charges & T&P etc. for proper completion of work. | 6,640 | M2 | 10 ₹66,400 | 10 ₹66,400 | 8.86 ₹58,830.4 Lowest | 9 ₹59,760 | 9 ₹59,760 | 10 ₹66,400 | 23 ₹1,52,720 |
| 4.00 | Centering and shuttering for C.C. work including cost of all materials, labour, T&P etc. required for proper completion of work. | 4,049.52 | M2 | 215 ₹8,70,646.8 | 180 ₹7,28,913.6 | 186 ₹7,53,210.72 | 170 ₹6,88,418.4 | 165 ₹6,68,170.8 | 150 ₹6,07,428 Lowest | 710 ₹28,75,159.2 |
| 5.00 | Laying M-15 cement concrete in sleepers,cutoff etc. with coarse sand of FM more than 2.0 and crushed hard stone grit of size 4.75 to 20 mm including cost of materials, labours, T& P etc. required for proper completion of work but excluding cost of centering and shuttering in construction of different part of structure. | 293.4 | M3 | 6,680 ₹19,59,912 | 5,500 ₹16,13,700 | 5,886 ₹17,26,952.4 | 5,360 ₹15,72,624 Lowest | 5,400 ₹15,84,360 | 6,300 ₹18,48,420 | 6,350 ₹18,63,090 |
| 6.00 | Painting on top of sleeper with two coats of bitumen (Grade 85/25) including cost of materials, fuel for heating, labour, T & P etc. required for proper completion of work. | 905.6 | M2 | 45 ₹40,752 | 50 ₹45,280 | 36 ₹32,601.6 | 39 ₹35,318.4 | 40 ₹36,224 | 35 ₹31,696 | 32 ₹28,979.2 Lowest |
| 7.00 | Supplying and laying of 150 micron LDPE film in side slope before laying of concrete in lining including cost of all material, labour, T & P etc. required for proper completion of work. | 6,640 | M2 | 39 ₹2,58,960 | 40 ₹2,65,600 | 36 ₹2,39,040 | 38 ₹2,52,320 | 38 ₹2,52,320 | 35 ₹2,32,400 Lowest | 35 ₹2,32,400 Lowest |
| 8.00 | Providing & laying 150mm wide PVC water stop seal at panel joints including cost of all material, labour, T&P etc. required for proper completion of work. | 2,928 | RM | 480 ₹14,05,440 | 600 ₹17,56,800 | 586 ₹17,15,808 | 470 ₹13,76,160 | 475 ₹13,90,800 | 400 ₹11,71,200 | 43 ₹1,25,904 Lowest |
| 9.00 | Laying M-15 cement concrete in 100 mm thick C.C. lining with coarse sand sand of FM more than 2.0 and crushed hard stone grit of size 4.75 to 20 mm including cost of materials, labours, T& P etc. required for proper completion of work but excluding cost of centering and shuttering in construction of different part of structure. | 6,640 | M2 | 790 ₹52,45,600 | 600 ₹39,84,000 Lowest | 686 ₹45,55,040 | 640 ₹42,49,600 | 645 ₹42,82,800 | 650 ₹43,16,000 | 665 ₹44,15,600 |
| 10.00 | Making construction groove in lined concrete surface as per drawing including painting with sealing primer on joint and filling groove with sealing compound including cost of all materials, fuel for heating, labour, T & P etc. required for proper completion of work. | 4,528 | RM | 95 ₹4,30,160 | 100 ₹4,52,800 | 86 ₹3,89,408 | 80 ₹3,62,240 | 85 ₹3,84,880 | 66.74 ₹3,02,198.72 | 14 ₹63,392 Lowest |
Tender Value
Refer Docs
EMD Value
₹7.0 L
Closing Date
9 Sept 2025, 1:00 pmClosed
Superintending Engineer, B S C C C-1 Mzp
Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
C.C. Lining in internal section between km. 24.150 to km. 25.500 to stop seapage and bank strengthening between km. 24.150 to km. 24.975 of Meja Jirgo Link Canal
2025_UPIDC_1070621_1
03/SE/2025-26
Open Tender
Civil Works
Item Rate
365 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹7.0 L
15 Oct 2025
2 Sept 2025
9 Sept 2025
2 Sept 2025
9 Sept 2025
2 Sept 2025
Amount
Earth work in excavation in sand stone,lime stone or other soft rock mixed with boulder by pick axe including all lead and lift with proper completion of work.
Providing and laying Coarse sand in filling for lining work & laying in filter including cost of all materials, labour charges & T&P etc. for proper completion of work.
Preparation of sub grade before laying of lining excluding cost of earth work all materials, labour charges & T&P etc. for proper completion of work.
Centering and shuttering for C.C. work including cost of all materials, labour, T&P etc. required for proper completion of work.
Laying M-15 cement concrete in sleepers,cutoff etc. with coarse sand of FM more than 2.0 and crushed hard stone grit of size 4.75 to 20 mm including cost of materials, labours, T& P etc. required for proper completion of work but excluding cost of centering and shuttering in construction of different part of structure.
Painting on top of sleeper with two coats of bitumen (Grade 85/25) including cost of materials, fuel for heating, labour, T & P etc. required for proper completion of work.
Supplying and laying of 150 micron LDPE film in side slope before laying of concrete in lining including cost of all material, labour, T & P etc. required for proper completion of work.
Providing & laying 150mm wide PVC water stop seal at panel joints including cost of all material, labour, T&P etc. required for proper completion of work.
Laying M-15 cement concrete in 100 mm thick C.C. lining with coarse sand sand of FM more than 2.0 and crushed hard stone grit of size 4.75 to 20 mm including cost of materials, labours, T& P etc. required for proper completion of work but excluding cost of centering and shuttering in construction of different part of structure.
Making construction groove in lined concrete surface as per drawing including painting with sealing primer on joint and filling groove with sealing compound including cost of all materials, fuel for heating, labour, T & P etc. required for proper completion of work.
Laying C.C. 1:3:6 in foundation (with 1 cement :3 Coarse sand FM not less than 2.00 :6 stone ballast size 20 to 40mm) including all cost of material, labour ,T&P etc. with all lead and lift required for proper completion of work.
C.R. stone masonry with 1:3 cement coarse sand mortar including cost of all material, labour and T&P etc. including all lead and lift for proper completion of work.
Providing and laying PVC pipe 75 mm dia. Including cutting and placing with cost of pipe ,labour ,T&P etc.required for proper completion of work.
Providing and Fixing Joint filler board including cost of material ,labour ,T&P etc. required for proper completion of work .
Cement pointing (Deep struck) 1:2 on stone masonry including cost of all material, labour, T&P etc. including all lead and lift for proper completion of work.
Providing and laying graded filter for Guide wall & Toe wall in layers as per drawing including cost of all materials, labour charges & T&P etc.
Coping with cement concrete (1:2:4) on top of stone masonry wall and Providing and laying cement concrete (1:2:4) for apron finished with floating coat of cement with all material, labour, T&P etc. with proper completion of work.
Earth work in filling for preparation of sub grade & strengthening of R/S & L/S canal embankment including all leads and lifts, labour charges, T&P etc. required for its disposal as per direction of Engineer-in-charge.
Cement plaster 1:3 on stone masonry including cost of all material, labour, T&P etc. including all lead and lift for proper completion of work.
M/S LALMANI MAURYA (BID ID -5518862)
S.B. ENTERPRISES (BID ID -5522574)
M/S CHAUDHARY ENTERPRISES (BID ID -5522094)
M/S RADHEY MOHAN DUBEY CONSTRUCTION (BID ID -5519065)
NIKHIL CONSTRUCTION (BID ID -5522718)
S.P.R.U INFRATECH PRIVATE LIMITED (BID ID -5520728)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_1953313.xls
BOQ • 0.35 MB
Tender_Document_03se202526.pdf
Tender Documents • 4.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .