| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-Finance | ₹18.1 L | L1 | Accepted-Finance OK |
| 2 | L2₹18.1 L+₹5,514.32 (0.31%)Accepted-Finance | ₹18.1 L+₹5,514.32 (0.31%) | L2 | Accepted-Finance OK |
| 3 | L3₹18.1 L+₹9,190.53 (0.51%)Accepted-Finance | ₹18.1 L+₹9,190.53 (0.51%) | L3 | Accepted-Finance OK |
| 4 | L4₹18.2 L+₹14,704.85 (0.81%)Accepted-Finance | ₹18.2 L+₹14,704.85 (0.81%) | L4 | Accepted-Finance OK |
Tender Value
₹18.4 L
EMD Value
₹2.2 L
Closing Date
19 Aug 2026, 2:00 pmClosed
EO
NPP MUNGRA BADSHAHPUR
WORK 03
2026_DOLBU_1173655_1
619
Open Tender
Civil Works
Percentage
NPP MUNGRA BADSHAHPUR
WORK 03
2 documents required · 2 mandatory
₹2,596
Yes
EO
₹2.2 L
Yes
8 Sept 2026
31 Jul 2026
19 Aug 2026
31 Jul 2026
19 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in ordinary soil for foundation including lead upto 30.00m and lift upto 1.50 m all complete (SI.No. 251) | - | Cum | 189 | - |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | - | Cum | 4,746.12 | - |
| 3 | Brick masonry work in 1:4 cement mortar in foundation complete excluding pointing 1200 II and plastering, as per drawing and Technical Specification Clauses 600, 1202 & 1203 | 1 | Cum | 6,904.8 | ₹6,897.9 |
| 4 | 12mm thick plaster in 1:4 with 1 cement : 4 fine sand motor including curing all complete. | - | SQM | 181.5 | - |
| 5 | Nominal mix 1:2:4 (Hand mixed) Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | 1 | Cum | 8,550.2 | ₹8,541.65 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). D.S.R.-2023 | - | Cum | 8,456.18 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars. DSR-2023 | - | KG | 78.72 | - |
| 8 | Construction fo Padustrial board oapproved quality and as per direction of E/I including all complete (AR) | - | JOB | 19,400 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_2204403.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .