Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹1.2 Cr+₹1.2 L (0.97%)Rejected-AOC | ₹1.2 Cr+₹1.2 L (0.97%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹1.2 Cr+₹1.9 L (1.56%)Rejected-AOC | ₹1.2 Cr+₹1.9 L (1.56%) | L3 | Rejected-AOC Third Lowest |
| Sl No | Description | Qty | Unit | Hindustan Engineers & Contractors L1 | SRI SAKTHY CONSTRUCTION L2 | T LOBI DHAS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 265 | M3 | 262 ₹69,430 Lowest | 264 ₹69,960 | 267 ₹70,755 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 17.5 | M3 | 5,346 ₹93,555 Lowest | 5,394 ₹94,395 | 5,444 ₹95,270 |
| 3.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 54 | M3 | 160 ₹8,640 Lowest | 161 ₹8,694 | 162 ₹8,748 |
| 4.00 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 56 | M3 | 374 ₹20,944 Lowest | 377 ₹21,112 | 381 ₹21,336 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 30 | M3 | 245 ₹7,350 Lowest | 247 ₹7,410 | 250 ₹7,500 |
| 6.00 | Damp proof course as per IS 3067:1988 with Cement Mortar 1:4 (One Cement and Four crushed stone sand) 12mm thick mixed with best approved quality Integral liquid water proofing compound conforming to Indian Standard specification as specified by the departmental officers at 2% by weight of cement used , finishing and curing etc. complete complying with standard specification - Manual Mixing | 27 | M2 | 302 ₹8,154 Lowest | 305 ₹8,235 | 307 ₹8,289 |
| 7.00 | Providing ANTI-TERMITE treatment to soil adjacent under building foundation, plinth periphery of the building by application of chemicals of ISI 63613 part I to IV in stages to suit the progress of work as per the detailed specification as below. Including breaking of termite mounds, making holes with clow bar, closing the holes after the treatment and including cost of chemicals, labour charges, transport and storing etc., complete and as directed by the departmental officers. | 170.9 | M2 | 145 ₹24,780.5 Lowest | 147 ₹25,122.3 | 148 ₹25,293.2 |
| 7.01Stage-1:Spraying anti-termite chemical solution for the foundation before laying concrete in bottom and sides of foundation. | ||||||
| 7.02Stage-2:Spraying anti-termite chemical solution to the grade beam level, spraying has to done for the grade beam, brick masonry contact with the back fill earth. | ||||||
| 7.03Stage-3: Spraying anti-termite chemical solution on the M-Sand for the flooring before laying the flooring concrete. This treatment has to be carried out on the M-Sand filling by making holes with crow bar to a depth of 60 cms and at 60cms intervals on both. | ||||||
Tender Value
₹1.2 Cr
EMD Value
₹71,000
Closing Date
25 Sept 2025, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Buildings Construction and Maintenance Circle, Tirunelveli
Construction of 6 Class room building in Government High School at Veeyanoor in Kanniyakumari District.
2025_PWD_602290_1
18(11) SE/2025-26 dated 02.09.2025
Open Tender
Civil Works - Buildings
Lump-sum
240 days
Veeyanoor
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹71,000
12 Nov 2025
11 Sept 2025
26 Sept 2025
11 Sept 2025
25 Sept 2025
11 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .