| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC | ₹14.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹15.0 LRejected-AOC | ₹15.0 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SAKTHI CONTRACTOR L2 | Thirumalesh Contractor L1 |
|---|---|---|---|---|---|
| 1.001.Construction Culvert at Ch-2500m in Venkatesapuram to border (via)Beggili- Enagubeeranapalli H/o.Venkatesapuram Rs.15.000 Lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 136.91 | Cum | 266.47 ₹36,482.41 | 263.65 ₹36,096.32 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 15.85 | Cum | 5,481.81 ₹86,886.69 | 5,423.75 ₹85,966.44 |
| 4.00Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle. | |||||
| 5.00 | Sides | 269.07 | Sqm | 553.08 ₹1.5 L | 547.23 ₹1.5 L |
| 6.00 | Deck Bottom | 22.5 | Sqm | 1,106.17 ₹24,888.83 | 1,094.45 ₹24,625.13 |
| 7.00 | Cement Concrete 1:3:6 mix using 40mm HBG metal for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 132.24 | Cum | 5,754.56 ₹7.6 L | 5,693.61 ₹7.5 L |
| 8.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 5.52 | Cum | 6,786.03 ₹37,458.89 | 6,714.15 ₹37,062.11 |
| 9.00 | Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 8.1 | Cum | 9,129.47 ₹73,948.71 | 9,032.77 ₹73,165.44 |
| 10.00 | Supplying & Fabricating and placing in position MS Steel or Ribbed Tor Steel for all Reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., Complete complying standard specification (Ms) | 0.8 | MT | 92,795.46 ₹74,236.37 | 91,812.57 ₹73,450.06 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
26 Feb 2026, 3:00 pmClosed
The Block Development Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme Mines and Minerals_2024_2025 Construction Culvert at CH-2500M in Venkatesapuram to Border (Via) Beggili - Enagubeeranapalli in Venkatesapuram Panchayat Package No_2025_26_SGI_130
2026_RDTN_663336_1
Rocno_1826_2025_E2
Open Tender
Civil Works
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
Yes
The Block Development Office Shoolagiri
14 Mar 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
24 Feb 2026
1.Construction Culvert at Ch-2500m in Venkatesapuram to border (via)Beggili- Enagubeeranapalli H/o.Venkatesapuram Rs.15.000 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle.
Sides
Deck Bottom
Cement Concrete 1:3:6 mix using 40mm HBG metal for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement Concrete 1:2:4 mix using 20mm HBG metal for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement Concrete 1:1.5:3 mix using 20mm ISS HBG metal for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Supplying & Fabricating and placing in position MS Steel or Ribbed Tor Steel for all Reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., Complete complying standard specification (Ms)
Supplying and Filling of Conveyed earth with a lead of 1km for basement filling
Provisin for Bitumen pad charges
Provision for Weep Holes
Provisin for Writing Name Board charges
Provision for Photographics charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.70 MB
tb130.pdf
Tender Documents • 0.35 MB
pb130.pdf
Tender Documents • 0.28 MB
BOQ_796360.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid