Tender Value
₹2.6 L
EMD Value
₹5,260
Closing Date
13 Jan 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive engineer
executive engineer PHED division jamwaramgarh
Work of Repairing top dome of GLSR near PHED office at RWSS Khawaraniji, Tehsil Jamwaramgarh, under Division Jamwaramgarh, Jaipur.
2026_PHCJA_524929_1
EE PHED DIVISION JAMWARAMGARH NIT No 65_2025_26
Open Tender
Civil Works
Percentage
30 days
jamwaramgarh
As per tender document
4 documents required · 4 mandatory
₹1,000
40796 EE PHED DIVISION JAMWARAMGARH
₹5,260
Yes
11 Feb 2026
3 Jan 2026
13 Jan 2026
3 Jan 2026
13 Jan 2026
3 Jan 2026
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 1.12.1.1 50 to 75 mm
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 1.12.1.2 80-110 mm
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil 1.12.1.3 125 to 165 mm
Welding on M.S. / G.I./CI Pipes and other material by Electric Welding, this includes all the material like welding rods/ equipment like welding machine/ generater, if required for job. 5.4.2, On Site
Providing, Fabrication of Mild Steel Plane Ended/ Flanged Specials like Tees, Bends, Reducers, Enlargers, Plugs, Tail Pieces and Blank Flange made from MS pipes, MS sheet strip and MS Sheet of required sizes by welding, cutting and treading as per site conditions and as directed by the Engineer- In- Charge complete in all respect.
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it and upto ground level for entire job contractor will use his own T and P and labour.
Add on above item no. 1.7 for B.T. Road
Add on above item no. 1.7 for CC Road
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil 1.9.1.1 80 mm to 110 mm
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil 1.9.1.2 125 mm to 165 mm
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil 1.10.1.1 80 mm to 100 mm
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil 1.10.1.2 125 mm to 150 mm
Supplying of Chuck Nut for different sizes of sluice valve and should be supplied as according to size of Check Nut including material for the following sizes. 5.9.1, Sluice Valve Size 80mm
5.9.2, Sluice Valve Size 100mm
5.9.3, Sluice Valve Size 125mm
5.9.4, Sluice Valve Size 150mm
Supplying of MS Rods for different sizes of sluice valve and should be supplied as according to size of old rods including material and finishing for the following sizes. 5.8.1, Sluice Valve Size 80mm
5.8.2, Sluice Valve Size 100mm
5.8.3, Sluice Valve Size 125mm
5.8.4, Sluice Valve Size 150mm
Providing of U Plate (U Stand) for different sizes of sluice valve and should be supplied as according to size of old U Plate including material for the following sizes. 5.10.1, Sluice Valve Size 80mm
5.10.2, Sluice Valve Size 100mm
5.10.3, Sluice Valve Size 125mm
5.10.4, Sluice Valve Size 150mm
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil 1.4.1.1 80 mm
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil 1.4.1.1 80 mm
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil 1.4.1.2 100 mm
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil 1.4.1.3 125 mm
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil 1.4.1.4 150 mm
stage.html
html • 0.03 MB
technical_936720.pdf
techsummary_936720.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.37 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
TD65.pdf
Tender Documents • 7.14 MB
BOQ_936720.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .