| Sl No | Description | Qty | Unit | CHANDRASEKARAN C L2 | Akash Rajasekar L1 |
|---|---|---|---|---|---|
| 1.00 | Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC size HBG metal | 10.05 | Cum | 5,350 ₹53,767.50 | 5,302 ₹53,285.10 |
| 2.00 | Spreading the collected US gravel 100mm thick watering and hand roller rolling including cost and supply of US gravel from approved quarry including cost and conveyance of all materilas to site including all labour charges | 9.48 | Cum | 1,060 ₹10,048.80 | 1,055 ₹10,001.40 |
| 3.00 | Providing and applying Tack Coat over BT surface using 3 kg of bitumen 60/70 for 10 sqmm area including cost and conveyance of all materilas to site including all labour charges | 592.5 | Cum | 37 ₹21,922.50 | 35 ₹20,737.50 |
| 4.00 | Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 14.81 | Sqm | 12,450 ₹1.8 L | 12,478 ₹1.8 L |
| 5.00 | Provision for Name board | 1 | No | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work} | 1 | GST Amount (in Rupees) | 49,432.19 ₹49,432.19 | 49,198.17 ₹49,198.17 |
Tender Value
₹3.3 L
EMD Value
₹3,260
Closing Date
18 Feb 2026, 9:00 amClosed
The Block Development Officer(BP)
Panchayat Union, Ariyalur
Renovation of BT road at Kallamedu middle street in Ottakovil Panchayat
2026_RDTN_659466_1
R.C.NO.A4/1551/2025, Date.09.02.2026
Open Tender
Civil Works - Roads
90 days
Ariyalur
As per tender document
5 documents required · 5 mandatory
₹0
₹3,260
26 Mar 2026
17 Feb 2026
18 Feb 2026
17 Feb 2026
18 Feb 2026
17 Feb 2026
Advance patchwork for making up the undulation in the existing BT surface to an average thickness of 25mm using 13.20mm IRC size HBG metal
Spreading the collected US gravel 100mm thick watering and hand roller rolling including cost and supply of US gravel from approved quarry including cost and conveyance of all materilas to site including all labour charges
Providing and applying Tack Coat over BT surface using 3 kg of bitumen 60/70 for 10 sqmm area including cost and conveyance of all materilas to site including all labour charges
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
TechnicalBid2.pdf
Tender Documents • 0.31 MB
PriceBid2.pdf
Tender Documents • 0.22 MB
BOQ_791213.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid