Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -31.99% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 LAdmitted-Finance | -31.73% | ₹2.7 L | L2 | Admitted-Finance |
| 3 | L3₹2.8 LAdmitted-Finance | -30.00% | ₹2.8 L | L3 | Admitted-Finance |
| 4 | L3₹2.8 LAdmitted-Finance | -30.00% | ₹2.8 L | L3 | Admitted-Finance |
| 5 | L4₹2.9 LAdmitted-Finance | -28.00% | ₹2.9 L | L4 | Admitted-Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
30 Jan 2026, 4:00 pmClosed
Er. Ravinder Kumar
Executive Engineer PWD RNB Division Kishtwar
Please refer BOQ
2026_PWDJK_300223_6
e-NIT No. 60 of 2025-26 Dated 10-01-2026
Open Tender
Civil Works
30 days
KISHTWAR
Please refer NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RNB Division Kishtwar
₹8,000
18 Feb 2026
10 Jan 2026
31 Jan 2026
10 Jan 2026
30 Jan 2026
10 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) using 20% plum
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc.
Carriage of Sand at an average distance of 30 Km by MT
Carriage of Bajrii at an average distance of 07 Km by MT
Carriage of Stone at an average distance of 05 Km by MT
Carriage of Mulba at an average distance of 05 Km by MT
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_974009.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid