| 1 | L1₹7.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹7.7 L+₹15,270.03 (2.02%)Rejected-AOC | L2 | Rejected-AOC Accepted |
Tender Value
Refer Docs
EMD Value
₹15,700
Closing Date
30 May 2025, 3:00 pmClosed
The Block Developement Officer Gudiyatham
The Block Developement Office Gudiyatham
Vellore District Construction of New Community Sanitary Complex (CSC) at Kallur in Seevoor Panchayat of Gudiyatham Block (SBM (G)) 15th CSC SBM 30Percentage Tied MGNREGS 2025-26(VP) Package no 01
2025_RDTN_561640_1
B4/51/2024 GUD-MAY 18-25
Open Tender
Civil Works
Item Rate
180 days
The Block Developement Office Gudiyatham
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹15,700
23 Jun 2025
26 May 2025
30 May 2025
26 May 2025
30 May 2025
26 May 2025
Amount
Vellore District Construction of New Community Sanitary Complex (CSC) at Kallur in Seevoor Panchayat of Gudiyatham Block (SBM (G)) 15th CSC SBM 30Percentage Tied MGNREGS 2025-26(VP)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Paving the flooring with special type of flooring tiles Wax finished Quota stone(20mm thick) in CM 1:3, 20mm thick
Dadooing walls with Colour Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard sepcification and as directed by the departmental officers size 150x150x6mm
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for Elastomeric paint over roof
Cost and supply of IWC
Cost and supply of EWC
Cost and supply of wash basin
Cost and supply of Wood plastic Composit door Door D1 0.75 m x 1.80m
Cost and supply of Wood plastic Composit door Door D 1.20 m x 1.80 m
Cost and supply of hand rail 40 m dia GI
Sanitary arrangements
110 mm dia pvc pipe
110 mm dia pvc pipe
110mm PVC TEE
500 lit HDPE tank
Providing Perforated Stainless Steel sheet (7.50x2.50cm) with Flat bar as border
Provision for Incinerator with Chula and vent pipe
Provision for Septic tank or leach pit (according to the site condition) with soak pits
Towards internal water supply arrangements and Electrification
Cost of poly carbonate transparaent sheet including necesaary angles
Cost and supply of RCC jolly
Towards Name board charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.Prabhu (BID ID -1351238)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_670664.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .