Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.0 L+₹358.69 (0.04%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹9.0 L+₹448.69 (0.05%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹9.0 L
EMD Value
₹8,974
Closing Date
16 Oct 2025, 2:00 pmClosed
Superintending Engineer
Generation Circle HPSEBL Bhabanagar
Repair. testing, machining, balancing, alignment and complete commissioning of Unit-3 Turbine assembly, MIV, DE and NDE bearing and thrust pads of Unit-3 of 4x500KW Rongtong HEP complete in all respect under Electrical Maintenance Division , HPSEBL
2025_HPSEB_117216_1
HPSEBL/SEGB/DB-7/2025-26-15
Open Tender
Electrical Works
Percentage
30 days
Kaza
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹8,974
28 Oct 2025
8 Oct 2025
17 Oct 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .