| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹5.2 LAccepted-AOC | ₹5.2 L | L3 | Accepted-AOC The contractor does not wish to carry out the work. |
| 2 | L1₹6.4 LRejected-Finance | ₹6.4 L | L1 | Rejected-Finance Rejected |
| 3 | L2₹6.3 LRejected-Finance | ₹6.3 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Karunakaran L3 | SHRI PACHAIYAMMAN CONSTRUCTION L2 | G R CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Formation of New WBM Road from Selvapuram Road to Kulathankarai @ Paliyapattu Panchayat | ||||||
| 1.01 | Clearing the scrub jungles including cutting the scrubs and removing away from the site etc., complete | 781.2 | Sq.m | 8 ₹6,249.6 | 6.35 ₹4,960.62 | 5.25 ₹4,101.3 Lowest |
| 1.02 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B fo foundation etc complete. | 151.2 | Cu.m | 150 ₹22,680 | 140.35 ₹21,220.92 | 116 ₹17,539.2 Lowest |
| 1.03 | Collection and supply of Girty gravel for side berms and labour charges for filling etc., completed | 37.8 | Cu.m | 345 ₹13,041 | 339.8 ₹12,844.44 | 282 ₹10,659.6 Lowest |
| 1.04 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.40mm IRC HBG metal and 0.24cum of gravel for blindage for 10 sqm of 75mm compacted thick (the blindage materials shall have PI Value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre measurement as directed by the departmental officers BOTTOM LAYER | 97.13 | Cu.m | 2,350 ₹2,28,255.5 | 2,326.76 ₹2,25,998.2 | 1,930 ₹1,87,460.9 Lowest |
| 1.05 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.40mm IRC HBG metal and 0.24cum of gravel for blindage for 10 sqm of 75mm compacted thick (the blindage materials shall have PI Value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre measurement as directed by the departmental officers TOP LAYER | 97.13 | Cu.m | 2,762 ₹2,68,273.06 | 2,758.43 ₹2,67,926.31 | 2,289 ₹2,22,330.57 Lowest |
| 1.06 | Provision for Hectometer | 1 | Nos | 575 ₹575 | 575 ₹575 | 550 ₹550 Lowest |
| 1.07 | Providing Name Board Charges etc | 1 | Nos | 500 ₹500 Lowest | 500 ₹500 Lowest | 500 ₹500 Lowest |
| 1.08 | Provision for Photographic Charges | 1 | Nos | 500 ₹500 Lowest | 500 ₹500 Lowest | 500 ₹500 Lowest |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 97,123 ₹97,123 | 96,125 ₹96,125 | 79,765 ₹79,765 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,360
Closing Date
20 Jul 2026, 3:00 pmClosed
BLOCKDEVELOPMENTOFFICEBPTS
BLOCKDEVELOPMENTOFFICEBPTS
Formation of New WBM Road From Selvapuram Road to Kulathakarai at Paliyapattu panchayat. Under General fund 2026-2027
2026_RDTN_684083_1
A4 668 2026dated12.5.2026
Open Tender
Civil Works - Roads
Lump-sum
60 days
Chengam
please refer thr tender documents
2 documents required · 2 mandatory
₹0
₹6,360
21 Jul 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Formation of New WBM Road from Selvapuram Road to Kulathankarai @ Paliyapattu Panchayat | |||||
| 1.01 | Clearing the scrub jungles including cutting the scrubs and removing away from the site etc., complete | - | Sq.m | - | - |
| 1.02 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B fo foundation etc complete. | 1 | Cu.m | - | - |
| 1.03 | Collection and supply of Girty gravel for side berms and labour charges for filling etc., completed | 1 | Cu.m | - | - |
| 1.04 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.40mm IRC HBG metal and 0.24cum of gravel for blindage for 10 sqm of 75mm compacted thick (the blindage materials shall have PI Value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre measurement as directed by the departmental officers BOTTOM LAYER | 1 | Cu.m | - | - |
| 1.05 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.40mm IRC HBG metal and 0.24cum of gravel for blindage for 10 sqm of 75mm compacted thick (the blindage materials shall have PI Value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre measurement as directed by the departmental officers TOP LAYER | 1 | Cu.m | - | - |
| 1.06 | Provision for Hectometer | - | Nos | - | - |
| 1.07 | Providing Name Board Charges etc | - | Nos | - | - |
| 1.08 | Provision for Photographic Charges | - | Nos | - | - |
| 2GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tenderdocuemtne.pdf
Tender Documents • 0.72 MB
BOQ_822329.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].