| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance | ₹2.7 L | L1 | Accepted-Finance L1 |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD return |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD return |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD return |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD return |
| Sl No | Description | Qty | Unit | D S DANY PLUMPING WORKS L1 |
|---|---|---|---|---|
| 1.00Providing Composit pit at Swamiyarmadam Market in Kattathurai Vpt. | ||||
| 1.01 | Collection and Supply of Conveyed earth with an average lead of 1 km filled in layers of 15 cm thick including watering and compaction etc., complete | 153.36 | cu.m | 138.7 ₹21,271.03 Lowest |
| 1.02 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 2.06 | cu.m | 4,356.9 ₹8,975.21 Lowest |
| 1.03 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 16.3 | Sqm | 451.6 ₹7,361.08 Lowest |
| 1.04 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 0.2 | MT | 75,783.2 ₹15,156.64 Lowest |
| 1.05 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherev | 1.87 | cu.m | 7,427.35 ₹13,889.14 Lowest |
| 1.06 | Precast concrete block masonry (including Quoin Blocks, Jamb blocks, closers, etc) with Solid cement concrete blocks of approved size size made of cement concrete 1:3:6 mix ( 1 cement, 3 coarse M.Sand, 6 graded stone aggregate 20mm and down gauge) in foundation and plinth in cement lime mortar 1:2:9 (1 cement, 2 lime putty 9 coarse M.Sand)/ 1:1:6 (1 cement, 1 lime putty, 6 coarse M.Sand )/ Cement 1:6 (1 cement: 6 coarse M.Sand) Details of cost for 1.89cum of precast concrete blocks masonry.) 100 sqft x 2/3 = 66 2/3 cft= 1.89cum) (No. 7.75) | 11.48 | cu.m | 5,025 ₹57,687 Lowest |
| 1.07 | Plastering with CM 1:5, 12mm thick in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 179.65 | cu.m | 232.4 ₹41,750.66 Lowest |
| 1.08 | Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification. Mineral colouring pigments not affected by lime should only be used (stainers and colour solutions should not be used.) | 141.65 | cu.m | 48.7 ₹6,898.36 Lowest |
| 1.09 | External - above Ground Level - GI Pipe-50 mm | 24 | Rm | 172.4 ₹4,137.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
28 Jul 2026, 3:00 pmClosed
Block Development Officer (V.Pt.),
Block Development Officer (V.Pt.), Thiruvattar Union
Providing Composit pit at Swamiyarmadam Market in Kattathurai Vpt
2026_RDTN_685552_1
A9/1908/2026
Open Tender
Civil Works
Item Rate
Thiruvattar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,500
19 Aug 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing Composit pit at Swamiyarmadam Market in Kattathurai Vpt. | |||||
| 1.01 | Collection and Supply of Conveyed earth with an average lead of 1 km filled in layers of 15 cm thick including watering and compaction etc., complete | - | cu.m | 168.15 | - |
| 1.02 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | - | cu.m | 5,281.15 | - |
| 1.03 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | - | Sqm | 547.5 | - |
| 1.04 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 1 | MT | 91,858.5 | ₹91,766.64 |
| 1.05 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherev | - | cu.m | 9,002.85 | - |
| 1.06 | Precast concrete block masonry (including Quoin Blocks, Jamb blocks, closers, etc) with Solid cement concrete blocks of approved size size made of cement concrete 1:3:6 mix ( 1 cement, 3 coarse M.Sand, 6 graded stone aggregate 20mm and down gauge) in foundation and plinth in cement lime mortar 1:2:9 (1 cement, 2 lime putty 9 coarse M.Sand)/ 1:1:6 (1 cement, 1 lime putty, 6 coarse M.Sand )/ Cement 1:6 (1 cement: 6 coarse M.Sand) Details of cost for 1.89cum of precast concrete blocks masonry.) 100 sqft x 2/3 = 66 2/3 cft= 1.89cum) (No. 7.75) | - | cu.m | 6,091 | - |
| 1.07 | Plastering with CM 1:5, 12mm thick in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. | - | cu.m | 281.77 | - |
| 1.08 | Colour washing two coats in all floors using best freshly burnt white shell lime and best quality of approved variety of colouring pigment including cost of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete complying with standard specification. Mineral colouring pigments not affected by lime should only be used (stainers and colour solutions should not be used.) | - | cu.m | 59.04 | - |
| 1.09 | External - above Ground Level - GI Pipe-50 mm | - | Rm | 209 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 0.62 MB
BOQ_824064.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].