Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹29.9 L (15.9%)Admitted-Finance | ₹2.2 Cr+₹29.9 L (15.9%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹34.9 L (18.5%)Admitted-Finance | ₹2.2 Cr+₹34.9 L (18.5%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹34.9 L (18.6%)Admitted-Finance | ₹2.2 Cr+₹34.9 L (18.6%) | L4 | Admitted-Finance |
| 5 | L5₹2.2 Cr+₹35.5 L (18.9%)Admitted-Finance | ₹2.2 Cr+₹35.5 L (18.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VINOD KUMAR AND CO L2 | Pardeep Kumar L14 | competent construction company L11 | KAVINDER VEER SINGH L12 | Anilkumargarg L8 | moni traders L7 | KHATRI CONSTRUCTION COMPANY L3 | Rohit Sharma L1 | M/S JAI BHAGWAN L4 | sunrise construction company L10 | sajjan engineers & builders L5 | Renu Construction Co. L6 | Chauhan Construction Company L13 | SUSHIL BUILDWELL PRIVATE LIMITED L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 4,160 | Cum | 20 ₹83,200 Lowest | 150 ₹6,24,000 | 150 ₹6,24,000 | 155 ₹6,44,800 | 140 ₹5,82,400 | 135 ₹5,61,600 | 80 ₹3,32,800 | 50 ₹2,08,000 | 100 ₹4,16,000 | 150 ₹6,24,000 | 125 ₹5,20,000 | 100 ₹4,16,000 | 150 ₹6,24,000 | 152.11 ₹6,32,778 |
| 2.00 | Providing and laying cement concrete pavement of M-10 with ready mixed concrete from batching plant of reputed cement manufacture and transported to the site of work in transit mixer having continuous agitated mixer, manufactured as premixed design of M-10 grade of cement concrete work including pumping of RMC from transit mixer to site. Placing in required camber compulsory with plate/ screed vibrator, with wire brush etc. and curing including cost admixture in recommended proportions as per I.S. 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per specifications and direction of Engineer-in-charge. Note :1) less cement used than specified in this item in recoverable separately. M-10 grade plain cement concrete by using 220 Kg of cement per cum of concrete. | 301 | Cum | 5,200 ₹15,65,200 | 4,200 ₹12,64,200 | 5,000 ₹15,05,000 | 4,500 ₹13,54,500 | 4,500 ₹13,54,500 | 4,000 ₹12,04,000 | 4,200 ₹12,64,200 | 4,000 ₹12,04,000 | 4,000 ₹12,04,000 | 4,500 ₹13,54,500 | 4,000 ₹12,04,000 | 3,000 ₹9,03,000 Lowest | 5,000 ₹15,05,000 | 5,700 ₹17,15,700 |
| 3.10 | Centering and shuttering including strutting, propping etc. and removal of form for: foundations, footings, bases of columns, etc. for mass concrete | 780 | Sqm | 200 ₹1,56,000 | 220 ₹1,71,600 | 207 ₹1,61,460 | 180 ₹1,40,400 | 200 ₹1,56,000 | 174 ₹1,35,720 | 150 ₹1,17,000 | 120 ₹93,600 | 150 ₹1,17,000 | 200 ₹1,56,000 | 100 ₹78,000 Lowest | 150 ₹1,17,000 | 200 ₹1,56,000 | 177.29 ₹1,38,286 |
| 3.20 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 5,850 | Sqm | 150 ₹8,77,500 Lowest | 450 ₹26,32,500 | 404 ₹23,63,400 | 350 ₹20,47,500 | 400 ₹23,40,000 | 350 ₹20,47,500 | 250 ₹14,62,500 | 250 ₹14,62,500 | 300 ₹17,55,000 | 400 ₹23,40,000 | 250 ₹14,62,500 | 300 ₹17,55,000 | 400 ₹23,40,000 | 346.09 ₹20,24,627 |
| 3.30 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform | 1,681 | Sqm | 200 ₹3,36,200 Lowest | 450 ₹7,56,450 | 450 ₹7,56,450 | 360 ₹6,05,160 | 420 ₹7,06,020 | 350 ₹5,88,350 | 275 ₹4,62,275 | 200 ₹3,36,200 Lowest | 350 ₹5,88,350 | 400 ₹6,72,400 | 300 ₹5,04,300 | 350 ₹5,88,350 | 400 ₹6,72,400 | 386.03 ₹6,48,916 |
| 4.00 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete,improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separatelyAll works upto plinth level. | 1,681 | Cum | 6,000 ₹1,00,86,000 | 6,600 ₹1,10,94,600 | 5,800 ₹97,49,800 | 6,100 ₹1,02,54,100 | 6,000 ₹1,00,86,000 | 5,800 ₹97,49,800 | 5,800 ₹97,49,800 | 5,000 ₹84,05,000 Lowest | 5,200 ₹87,41,200 | 6,200 ₹1,04,22,200 | 5,800 ₹97,49,800 | 6,000 ₹1,00,86,000 | 6,000 ₹1,00,86,000 | 6,137 ₹1,03,16,297 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars | 1,53,173 | Kg | 50 ₹76,58,650 | 60 ₹91,90,380 | 60 ₹91,90,380 | 62 ₹94,96,726 | 53 ₹81,18,169 | 59 ₹90,37,207 | 56 ₹85,77,688 | 45 ₹68,92,785 Lowest | 60 ₹91,90,380 | 51 ₹78,11,823 | 55 ₹84,24,515 | 60 ₹91,90,380 | 60 ₹91,90,380 | 51.74 ₹79,25,171 |
| 6.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 4,160 | Cum | 250 ₹10,40,000 | 125 ₹5,20,000 | 125 ₹5,20,000 | 120 ₹4,99,200 | 100 ₹4,16,000 | 94 ₹3,91,040 | 80 ₹3,32,800 | 50 ₹2,08,000 Lowest | 70 ₹2,91,200 | 125 ₹5,20,000 | 100 ₹4,16,000 | 100 ₹4,16,000 | 120 ₹4,99,200 | 110.2 ₹4,58,432 |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
12 Jan 2022, 3:00 pmClosed
Executive Engineer CD VII IFCD
Civil Division VII IFCD Rohini Office Complex Sector 15 Rohini Delhi
Construction of RCC Outfall Drain from Libaspur Near Jeevan park to 66 feet road at village Siraspur in Distt. North. Reg.No.758 Part-III.
2021_IFC_213888_1
EE/CD-VII/NIT/2021-22/54
Open Tender
Civil Works
Item Rate
180 days
Civil Division VII IFCD Rohini Office Complex Sect
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹5.6 L
18 Jan 2022
31 Dec 2021
12 Jan 2022
31 Dec 2021
12 Jan 2022
31 Dec 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying cement concrete pavement of M-10 with ready mixed concrete from batching plant of reputed cement manufacture and transported to the site of work in transit mixer having continuous agitated mixer, manufactured as premixed design of M-10 grade of cement concrete work including pumping of RMC from transit mixer to site. Placing in required camber compulsory with plate/ screed vibrator, with wire brush etc. and curing including cost admixture in recommended proportions as per I.S. 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per specifications and direction of Engineer-in-charge. Note :1) less cement used than specified in this item in recoverable separately. M-10 grade plain cement concrete by using 220 Kg of cement per cum of concrete.
Centering and shuttering including strutting, propping etc. and removal of form for: foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete,improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separatelyAll works upto plinth level.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
VINOD KUMAR AND CO
KHATRI CONSTRUCTION COMPANY
M/S JAI BHAGWAN
sajjan engineers & builders
Renu Construction Co.
moni traders
Anilkumargarg
SUSHIL BUILDWELL PRIVATE LIMITED
sunrise construction company
competent construction company
KAVINDER VEER SINGH
Chauhan Construction Company
Pardeep Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_274308.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .