| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.1 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹99.3 L+₹22.2 L (28.7%)Rejected-Finance KARNATAKA | RAICHUR | KARNATAKA | 584123 | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹1.0 Cr+₹26.5 L (34.3%)Rejected-Finance | L3 | Rejected-Finance L3 BIDDER | |
| 4 | Rejected-Technical | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | M/S SHRI PAL JAIN L3 | SATYAM CONSTRUCTIONS L2 | SAKSHAM BUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00work | ||||||
| 1.01 | Cutting heavy under growth and bushes up to 7.5cm. dia i/c removal of roots with collection and removal. | 27,776 | M³ | 3.9 ₹1,08,326.4 | 5 ₹1,38,880 | 1 ₹27,776 Lowest |
| 1.02 | Dag belling 7.5 Cms. Deep i/c all cost of material labour,T&P etc. | 3.5 | Km. | 290 ₹1,015 Lowest | 50,000 ₹1,75,000 | 300 ₹1,050 |
| 1.03 | Earth work in M.K.R. and Kanker mixed soil in Excavation of foundation inclucing lead up to 30m. and lift up to 1.50m. i/c dressing making profile and manual compaction. | 367 | M³ | 80 ₹29,360 | 90 ₹33,030 | 50 ₹18,350 Lowest |
| 1.04 | Laying Lean P.C.C. 1:3:6 with stone Grit (20-40 mm) size including all cost of material and labour, T&P etc. for proper compection of work. | 78 | M³ | 4,589 ₹3,57,942 | 3,900 ₹3,04,200 | 2,850 ₹2,22,300 Lowest |
| 1.05 | Laying C.C. 1:2:4 with stone Grit (10-20 mm) size including all cost of material and labour, T&P etc. for proper compection of work. | 262 | M³ | 5,189 ₹13,59,518 | 5,200 ₹13,62,400 | 3,750 ₹9,82,500 Lowest |
| 1.06 | Suppling and placing of precast boundary wall (panel size 1.80m x 0.30 m) of M-25 grade cement concrete Piller spacing 1.80m c/c with three nos tor steel bars in longitudinal section and five nos in transvers section of panel and 6 nos tor steel bars with 6 nos tor steel stirrups of 6 mm dia in piller for thermal reinforcement including all cost of material, labour, T&P etc. As per instruction of Engineer-in-Charge. | 6,660 | M² | 1,039 ₹69,19,740 | 988.5 ₹65,83,410 | 870 ₹57,94,200 Lowest |
| 1.07 | Painting plastic emulsion paint/ Apex Ist quality/ Berger/ Asian Paint two coat with material, labour T&P etc. | 13,320 | M² | 119 ₹15,85,080 | 100 ₹13,32,000 | 50 ₹6,66,000 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
22 Aug 2025, 2:00 pmClosed
SE IWC LALITPUR
OFFICE OF SE IWC LALITPUR
Construction of Boundary Wall at D/S of Govind Sagar Dam to protect the departmental land at Dist Lalitpur
2025_UPIDC_1058993_1
01/SE/2025-26
Open Tender
Civil Works
Item Rate
120 days
LALITPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.5 L
OFFICE OF SE IWC LALITPUR
6 Nov 2025
22 Jul 2025
22 Aug 2025
22 Jul 2025
22 Aug 2025
22 Jul 2025
29 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .