Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | ₹7.5 L | L1 | Accepted-AOC LOWEST AND ACCEPTED |
| 2 | L2₹7.6 LRejected-Finance VILL MAMAKPUR P O RAJHAIF BANDAR DISTRICT HOOGHLY | HOOGHLY | ₹7.6 L | L2 | Rejected-Finance HIGHER |
| 3 | L3₹7.6 LRejected-Finance VILL HASNABAD GHOSH PARA P O P S HASNABAD DISTRICT SOUTH 24 PARGANAS PIN 743426 | HASNABAD | SOUTH 24 PARGANAS | WEST BENGAL | 743426 | ₹7.6 L | L3 | Rejected-Finance HIGHER |
Tender Value
₹7.6 L
EMD Value
₹15,150
Closing Date
16 Mar 2026, 2:00 pmClosed
EXECUTIVE ENGINEER AI IP DIVISION BURDWAN
OFFICE OF THE EXECUTIVE ENGINEER AI IP DIVISION BURDWAN, 3rd Floor , Purta Bhavan
Installation of 01 No clustered (2) Sprinkler Irrigation system (Solar) at Buri Pukur WHT Scheme
2026_WRDD_1016118_1
05/CORE/WRIDD/BWNIP OF 2025-26
Open Tender
CIVIL WORKS
Percentage
120 days
Mouza Dharaspur JL 50 Plot No 275 in Salanpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,150
3 Jun 2026
28 Feb 2026
18 Mar 2026
28 Feb 2026
16 Mar 2026
28 Feb 2026
SPRINKLER IRRIGATION SYSTEM
Installation of 2 H.P. Solar Water Pumping System with surface Pump including SPV,PCU,Pump Motor, all other electrical accesoiries and fabrication,construction &installation of metal koisk.(Detals of Work in SOLAR PUMP Sheet)
Institutional Development for formation and registration of WUA and allied activities through creation of mass awareness and capacity building among them to achive success and sustanability of M.I. Sub Project and Impact Study & monitoring of clustered Sub project by site visit of Community Workers during 3 years' period after commissioning of Sub project.(Detals of Work in WUA Sheet)
QRC HDPE Pump connecting nipple 63mm
HDPE Pipe with Quick Release Coupler (Pipe of Class II; 3.2Kg/cm2) 63mm dia. 6m long
HDPE Tee with coupler (63mm)
HDPE Bend with coupler 90 degree (63mm)
HDPE End Plug (63mm)
HDPE 63mm service saddle
End Riser Pipe 3/4" diameter x 100 cm
Sprinkler Nozzles Full Circle (1.7 to 2.8 Kg/cm2) 2050 LPH
Total Cost
Add GST@18%
Total including GST
Add Cess @1%
Total cost
Say Rs.
Solar Module: Supply , transport , installation and commissioning of ISI marked Solar Modules as per following specification: 1. Cell: Indigenous mono crystalline silicon SPV cells 2. Solar Module: Monocrystalline cell with PERC technology / module with bifacial cell. 3. Standards: ISI marked as per IS 14286 and having certification of IEC 61853(1), 61730(1&2), 61710 4.Modules must qualify to IS 170210 (Part 1) 5.Min. Efficiency: 19.5%. 6. Fill factor: More than 75% . 7. Module wattage mismatch in the SPV array: within ±3% 8. Wattage output warranty:Should not be less than 90% at the end of 10 years and 80% at the end of 25 years. 9.The power output of individual PV modules used in the PV array, under STC: minimum 300 Wp. Necessary test certificates also to be supplied. For detail information please see Cl. no. 2.1 of technical specification .
b) For 2 HP Off-grid Solar Water Pumping System with Monocrystalline/ Monocrystalline PERC/bifacial SPV modules - 2150- 2400 Wp.
Module Mounting Structure : Supply , transportation & installation of G.I manual tracking / Fixed structure made of MS hollow sections, pipes, plates, angles etc as per IS:4923, IS:1161/1239, IS:1079/2062, to hold min 300 Wp SPV Module as per drawing and technical specification. The steel structure is to be protected with minimum 80 micron galvanisation(hot dip) and provided with fixed arrangement or dual axis manual tracking arrangement for three times in a day and seasonal tilting to face the sun optimally.
The approximate weight of the Module Mounting Structure given in Clause no.5.1 should be followed.( 1 no. 4 module Fixed str.)
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per drawing.
For 4 module structure
b) For 2 HP capacity Pump-motor set with DC input
Cable and Accessories : Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc. i. 4.0 Sq mm single core multi studs - 5m(for 1HP/2HP/3HP) & 20m(for 5/7.5/10/15/17.5/20 HP) ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc
b) For 2 or more structure per structure with 9m distance between sturctures.
Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.
Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages.
a) Lighting System at Scheme: (with lighting Pole) : Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm , medium duty pipe, with 12 V, 15Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 7-11watt LED lamp , 50 Wp solar panel (min 19% Eff.) to cover the scheme area. The lighting system should be warranted for 5years from the date of installation.
a) Lightning protection (Pole mounted): Lightning protection with 1.5" G.I pipe of 4 mts + 0.75 mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. (Provision of one lightning protection for each structure)
Supply and installation of 3 phase AC electromotor pump-motor set with speed of 3000 r.p.m(synchronous speed) suitable for Solar applications and shall have 60 months guarantee for the following conditions including loading, unloading, transportation etc.:- (Refer technical specification for more detail)
b) 2 HP 3 phase Monoblock Pump-motor having discharge at required head as below::-
i) 2 HP 3 phase AC surface mounted Monoblock Pump-motor set as per IS 9079 with 2.60 - 2.78 Lps discharge at 26 mts. total head suitable for 2.0 Ha CCA Sprinkler / Drip operation with foot valve, required quantity of flexible suction pipe(15m), clamps, bend, footvalves and all other accessories to complete connection of suction and delivery side .
Testing and commissioning of scheme after completion of all work
a) Supply, fitting and Fixing of Pump-motor shed of height 0.85m(as per drawing) with Hot dip Galvanised ISA 25X25x3 & 1.5mm MS sheet including foundation Base of 0.95m x 0.65m for Pump Unit ( BFS, .075mm 1:2:4 PCC, 100mm 1:1.5:3 CC) - For 2HP and 3HP surface pump.
Comprehensive maintenance charges for 5 years (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time)
b) For 3 HP both for Submersible & Surface pump
Note:1 Total comprehensive maintenance charge is to be withheld in addition to Securirty Deposit. Comprehensive maintenance charges will be released @ i) Rs 0.80 for 2 HP, ii) Rs.0.80 for 3 HP, iii) Rs.0.60 for 5 HP / 7.5/ 10 HP / 15HP / 17.5HP and 20 HP Submersible & Surface per Wp per year at the end of each maintenance period i.e.at the end of 1st year, 2nd year, 3rd year, 4th year& 5th year. In case the “Bidder” does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited
Insurance @ 2% for Item No. 1, 4, 8, and 10 for a period of 5 years.
Note:2 Ist year's Insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd , 4th & 5th year on production of Original Receipt of premium payment.
Remote monitoring for 5 years: Provision for remote monitoring for the pumps must be made in the pump controller through an integral arrangement having following basic functions: a. Controller must be assigned with a unique serial number and its live status must be observed remotely on online portal through login credentials. b. Live status must indicate whether controller is ON/ OFF. The parameters i.e. the water output, water flow rate, in fault condition, array input voltage/ current, power and motor frequency should at logged at an interval of 10 minutes c. Controller must have a back up to store the data locally ( at least for 1 year) supply & installation of GSM/GPRS based Data Transmitter or Modem and to provide remote monitoring service to transmit the parameters to central server from the solar pumping system with time stamp at user-defined interval and report generation at the buyer end. (Refer Technical Spec.)
Cleaning and washing of modules once in a month with clear water to remove deposited dust and dirt on the module surface and keep the modules clean throughout the year. The activity to be performed for eight months in a year excluding four monsoon months. A log book should be maintained at the site for the said purpose.
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding LS and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.
Sub Total
Add GST@18%
Sub Total
Grand Total
Say Rs.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 0.55 MB
Tendernotice_3.pdf
PDF • 0.75 MB
BOQ_2496404.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].