| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹8.5 L+₹1,271.18 (0.15%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹8.5 L+₹1,694.90 (0.20%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Nabashem Warjri L3 | terence remdor syiem L2 | Peter O Lyndem L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by manual means up to a depth of 2m below the existing ground level for foundation trenches of foundations, footings of column/ walls, retaining walls, septic tank etc. including bailing out water where necessary and removal Of surplus earth with all lead and lifts
All kinds of soil (ordinary soil/ hard soil/ dense soil) | 7.38 | cum | 750 ₹5,535 | 750 ₹5,535 | 250 ₹1,845 Lowest |
| 2.00 | Random rubble masonry with hard stone in foundation and
plinth including levelling up with cement concrete 1:6:12 (1
cement: 6 coarse sand: 12 graded stone aggregate 20 mm
nominal size) up to plinth level with:
Cement mortar 1 :6 (1 cement: 6 coarse sand) | 3.6 | cum | 5,000 ₹18,000 Lowest | 5,000 ₹18,000 Lowest | 6,000 ₹21,600 |
| 3.00 | Providing soling with stone/ best quality picked jhama brick,
sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete.
Stone Soling
100 mm | 145 | Sqm | 450 ₹65,250 | 450 ₹65,250 | 390 ₹56,550 Lowest |
| 4.00 | Plain cement concrete works in foundation bed for footing steps, walls, brick works etc below plinth level as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately).
Prop: 1:3:6 | 22.51 | cum | 5,815 ₹1,30,895.65 | 5,800 ₹1,30,558 Lowest | 6,500 ₹1,46,315 |
| 5.00 | Structural steel work in single section, fixed with or without per kg 117.00 connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,644.11 | kgs | 108 ₹1,77,563.88 | 109 ₹1,79,207.99 | 100 ₹1,64,411 Lowest |
| 6.00 | Steel work in built up tubular (round, square or rectangular
hollow tubes etc.) trusses etc„ including cutting, hoisting,
fixing in position and applying a priming coat of approved
steel primer, including welding and bolted with special shaped washers etc. complete. | 1,384.58 | kgs | 190 ₹2,63,070.2 | 189 ₹2,61,685.62 Lowest | 228 ₹3,15,684.24 |
| 7.00 | Providing and fixing pre-coated galvanised iron profile sheets (size, shape and pitch Of corrugation as approved by
Engineer-in-charge) 0.50 mm(+O.05 a/o) total coated thickness with zinc coating 120 grams per sqm as per ls:277, in 240 Mpa steel grade, 5-7 microns epoxy primer on both side Of the shect and polyester top coat 15-18 microns. Sheet should have protective guard film Of 25 microns minimum to avoid scratches during transportation and should be supplied in single length up to 12 mcter or as desired by Engineer-incharge. The sheet shall be fixed using selfrdrilling/ selftapping screws of size (5.5x55 mm) with EPDM seal, complete up to any pitch in horizontav vertical or ciirved surfaces, excluding the cost of purlins. rafters and trusses and including cutting to size and shape wherever required | 138 | sqm | 1,000 ₹1,38,000 | 1,000 ₹1,38,000 | 660 ₹91,080 Lowest |
| 8.00 | Providing & fixing UV stabilized fibreglass reinforced plastic sheet roofing up to any pitch. including fixing with polymer coated 'J` or 'L' hcoks, bolts & nuts 8 mm dia. G.I plain/ bitumen washers complete but excluding the cost Of purlins, rafters, trusses, ctc. The sheets shall be manufactured out Of 2400 TEX panel rovigs incorporating minimum 0.3% ultraviolet stabilizer in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to ls:10192 and ls:12866. The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified
2 mm thick flat | 27 | sqm | 1,320.3 ₹35,648.18 | 1,307.5 ₹35,302.58 | 800 ₹21,600 Lowest |
| 9.00 | 20 mm cement plaster of mix:
1:4 | 9 | sqm | 300 ₹2,700 | 300 ₹2,700 | 268.75 ₹2,418.75 Lowest |
| 10.00 | Painting with synthetic enamel paint of approved brand and
manufacture to give an even shade
New work (two or more coats) | 89.82 | sqm | 100 ₹8,982 Lowest | 100 ₹8,982 Lowest | 249.9 ₹22,446.02 |
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
19 Sept 2026, 5:30 pmClosed
Director NIT Meghalaya
Executive Engineer NIT Meghalaya, Saitsohpen Sohra 793108
Construction of Bus Shelters at Boys and Girls Hostels, NIT Meghalaya Permanent Campus, Saitsohpen, Sohra
2026_NITM_925714_1
NIT/EN/TENDER/13/26-27/13
Limited
Civil Works
Works
21 days
NIT Meghalaya Sohra
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
Yes
1 Oct 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
NIT.pdf
Tender Document • 1.16 MB
Tendernotice_1.pdf
Tender Document • 1.18 MB
BOQ_972787.xls
BOQ • 0.26 MB
NIT.pdf
Tender Documents • 1.16 MB
BOQ_972787.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .