| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1 L
Closing Date
9 Oct 2021, 6:55 pmClosed
Executive Engineer REW Div. Poonch
office of the Executive Engineer REW Div. Poonch
Please refer to BOQ
2021_RDPR_142005_5
e-NIT No. 132 of REW Poonch Dated 30-09-2021
Open Tender
Civil Works
Item Rate
20 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer REW Div. Poonch
Exempted
10 Nov 2021
30 Sept 2021
11 Oct 2021
30 Sept 2021
9 Oct 2021
30 Sept 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 30% boulders
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for:Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form work for: Edges of slabs and breaks in floors and walls Under 20 cm wide
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate.
Carriage of material loading/unloading & stacking complete
Sand and stone agg. Below 40mm nominal size 15 Km by MT & 600 Mtr by HL
Stone 50 Mtr by HL
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .