Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC | ₹5.3 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹5.8 Cr+₹50.3 L (9.41%)Rejected-Finance 3062617 6571 26 | ERODE | TAMIL NADU | 638002 | ₹5.8 Cr+₹50.3 L (9.41%) | L2 | Rejected-Finance Higher than Lowest |
| 3 | L3₹5.9 Cr+₹58.2 L (10.9%)Rejected-Finance 4 607001 | CUDDALORE | TAMIL NADU | 607001 | ₹5.9 Cr+₹58.2 L (10.9%) | L3 | Rejected-Finance Higher than Lowest |
Tender Value
₹5.3 Cr
EMD Value
₹2.8 L
Closing Date
29 Oct 2019, 3:00 pmClosed
Superintending Engineer-H-CandM Circle Villupuram
Office of the Superintending Engineer-H-C and M- Circle Ellis Chatram Road-Vazhudareddy-Villupuram
Widening Strengthening Improvements and Culvert including upkeeping works for 60 Months in Cuddalore-H- C and M Subdivision Jurisdiction Package-63
2019_HWAY_137768_1
TN14-2019-20-HDO-Dt.29.08.2019
Open Tender
Civil Works - Highways
Percentage
180 days
Cuddalore
Refer PQ Document VOL-I
8 documents required · 8 mandatory
₹0
₹2.8 L
Yes
12 Jan 2020
13 Sept 2019
31 Oct 2019
13 Sept 2019
29 Oct 2019
27 Sept 2019
16 Sept 2019 - 23 Sept 2019
eProcurement System Government of Tamil Nadu Created By: Solaiappan R Created Date/Time: 08-Nov-2019 08:23 PM Tender Title: Package 63-CRIDP 2019-20 Tender ID: 2019_HWAY_137768_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Villupuram Circle
Widening, Strengthening, Improvements and Culvert including upkeeping works for 60 Months in Cuddalore (H) C&M Subdivision Jurisdiction (Package-63) A-Widening from Two lane to Three lane and Strengthening of Cuddalore - Tirukoilur-Sankarapuram road at km 13/2-14/0 (SH-68) Including Upkeepingfor a period of 60 Months B-Improvements of Sitharasur road at km 0/0-1/0 including Reconstruction of culvert at km Km 0/6, 0/10, (i), 0/10, (ii) (MD 585) Including Upkeepingfor a period of 60 Months C-Improvements of Sitharasur road at km 1/0-2/4 including Reconstruction of culvert at km 1/6, 2/2 (MD 585) Including Upkeepingfor a period of 60 Months D- Improvements of Sitharasur road at km 2/4 - 3/6 including Reconstruction of Box culvert at km 3/2 , 3/4 (MD 585) Including Upkeepingfor a period of 60 Months E- Improvements of Sitharasur road at km 3/6 - 4/9 including Reconstruction of culvert at km 3/8 , 3/10 (MD 585) Including Upkeepingfor a period of 60 Months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 R GANAPATHY 47258785.970 1.000 53459139.000 Five Crore Thirty Four Lakh Fifty Nine Thousand One Hundred and Thirty Nine
2.00 SVTCONSTRUCTION 47258785.970 12.000 59281421.000 Five Crore Ninty Two Lakh Eighty One Thousand Four Hundred and Twenty One
3.00 SRV CONSTRUCTION 47258785.970 10.500 58487474.000 Five Crore Eighty Four Lakh Eighty Seven Thousand Four Hundred and Seventy Four
Lowest Amount Quoted BY: R GANAPATHY(53459139.000)
BOQ Summary Details Tender Title: Package 63-CRIDP 2019-20 Tender ID: 2019_HWAY_137768_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 R GANAPATHY 53459139.000 L1
2 SRV CONSTRUCTION 58487474.000 L2
3 SVTCONSTRUCTION 59281421.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .