Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC PLOT NO 30 KRISHNA COTTAGE SUNDARAM NAGAR MUTHAIPURAM TUTICORIN 628 005 | TUTICORIN | TUTICORIN | TAMIL NADU | 628005 | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.0 L+₹55,762 (1.96%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹22,600
Closing Date
11 Mar 2025, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ICHP Attending preventive maintenance and monitoring works to avoid breakdown in Conveyors 59AB.
2025_EB_528030_1
CE/SE/MI/TTPS/26/2025-2026
Open Tender
Miscellaneous Works
Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,600
Yes
18 May 2025
25 Feb 2025
12 Mar 2025
25 Feb 2025
11 Mar 2025
25 Feb 2025
Charges for clearing the spilled and accumulated coal on the conveyor floor, head end areas, deck sheets, walkways, tail end areas of conveyor 59A& 59B and bunker floor and disposing through the running conveyors to the bunkers - including the hire charges for T&P’s cost of consumables charges for all leads and lifts etc complete.
Charges for Round the clock monitoring of the mechanical equipments of conveyor 59A and 59B, including the works of belt train up, Idler and frame renewal, skirt rubber adjustment, condition monitoring of conveyor belt joint condition monitoring of gear box and fluid couplings, scrapper adjustment and renewal counter weight position monitoring condition monitoring of tail end chutes liner deflector plates store devolution etc. - including the hire charges for T&P’s cost of consumables charges for all leads and lifts etc complete
Charges for assisting works for belt joint in conveyor 59A and 59B including arresting the belt by providing clamps lifting the counter weight dismantling the idlers and idler frames and skirt board assembly and re-fixing the same after vulcanizing the joint including T&P hire charges cost of consumables etc., complete.
Charges for assisting works for pulley lagging works in conveyor 59A and 59B including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trail operation including T&P hire charges cost of consumables etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in tail pulley / tail snub pulley / bend pulley and take up moveable pulley in conveyor 59A and 59B including arresting the conveyor belt lifting the counter weight and normalizing the system after bearing overhauling, trial operation including the cost of consumables, T&P hire charges etc., complete.
Charges for overhauling and inspection of pulley bearings and replacement if necessary in head pulley / head snub pulley / drive pulley in conveyor 59A and 59B including arresting the conveyor belt lifting the counter weight and normalizing the system after pulley lagging, trial operation including T&P hire charges and cost of consumables etc., complete.
Ramaganapathy Enterprises (BID ID -1267382)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .