Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.0 CrAccepted-AOC | ₹32.0 Cr Quoted ₹32.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹37.3 CrRejected-Finance | ₹37.3 Cr | L2 | Rejected-Finance L2, Hence rejected |
| 3 | Not Admitted-Fee/PreQual/Technical PLOT NO B 1 INFOCITY SECTOR 34 GURGAON HARYANA 122004 | GURUGRAM | HARYANA | 122004 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹59.8 L
Closing Date
20 Jul 2020, 5:00 pmClosed
Executive Engineer-Project,Water Supply Div.GMDA
Executive Engineer-Project,Water Supply Div.GMDA,Plot no.2,Sec-44,Gurugram
Construction of 20 MLD STP on Sequential Batch Reactor(SBR) technology alongwith Main Pumping Stations and O and M for 8 years after completion of 1 year Defect Liability Period on turnkey basis complete in all respect at Jahajgarh, Gurugram
2020_HRY_133867_1
Job No.4/2020/ GMDA (Proj. Div)
Open Tender
Civil Works
540 days
Gurugram
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
GMDA
₹59.8 L
Executive Engineer-Project,Water Supply Div.
10 Aug 2020
30 Jun 2020
21 Jul 2020
30 Jun 2020
20 Jul 2020
30 Jun 2020
3 Jul 2020
Amount
Part A-SewagePumpingStations( SPS)
Tapping of outfall of sewage &Design, drawing, construction of Main Sewage Pumping stations as detailed below consisting of extension of existing sewer to MPS, inlet chamber with sluice gate, screening chamber with screens, collecting tank, DI double flanged delivery pipe , NRVs, dismantling pieces, gate valves, header pipe , specials, lifting arrangement with RS joist & chain pullet block along with supplying, installation, testing & commissioning of non- clog sewage submersible pumping sets fitted with efficient motor , mechanical seal, thermal & moisture sensors, suspension device, auto coupling bracket, 6 m guide pipe, panel, panel room, Genset, all other building , electrical, mechanical, civil works complete in all respect as per scope of work & specification. and Operation and maintenance cost for MPS and all other works created under the contract for 8 years as well as for defect liability period of 12 months which includes basic service charges having expenditure and expenses required to be incurred on labour, repair and / or replacement of materials, equipments, consumable items, water and all other matters and items of what so ever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Consumables as per Scope of Work & terms and conditions of contract etc. complete.(This is excluding electric power cost of which shall be borne by the department & high speed diesel which shall be reimbursed to agency by the department as per actual consumption against proof).
Part B-Sewage Treatment Plants( STPs)
NS Part C- DI (K-9) cement lined pipe alongwith O&M for 8 years and 1 year DLP Supply, laying, cutting, jointing, testing and commissioning of DI/K-9 cement lined pipe including excavation i) For disposal of treated water outside the campus of the STPs to a drain and ii) For carrying pumped untreated effluent from MPS to STP as per details below:
A) Min. 700 mm i/d from MPS to STP-50 m (within STP premises)
B) Min. 300 mm i/d from STP to Green Belt nearest Existing Drain- 1100m
NS Part D-Campus Development Work alongwith O&M for 8 years and 1 year DLP
i) Boundary wall
ii)Land development for levelling
iii)Road
iv)Pathway
v) Storm water drain
vi) Horticulture operation
vii)Sign board
Khilari Infrastructure Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid