Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹2.0 L+₹2,160 (1.10%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹2.1 L+₹12,340 (6.30%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest | |
| 4 | Not Admitted-Fee/PreQual/Technical H NO 413 VILLAGE SULKHANI P O BUGANA 125121 | HISAR | HARYANA | 125121 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.6 L
EMD Value
₹3,000
Closing Date
12 Jan 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
CONSTRUCTION OF 01 NO. 132/33KV BAY FOR 40MVA TRANSFORMER FOR WORK OF INCREASING CAPACITY FROM 2x40MVA TO 3x40MVA AT 132KV SUBSTATION KADIPUR UNDER ELECTY. TRANSMISSION DIVISION SULTANPUR
2022_UPTCL_763888_1
S.T. T.No. 40/ETCS/2022-23
Open Tender
Electrical Works
Item Wise
60 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
SE ETC Sultanpur
₹3,000
19 Jan 2023
31 Dec 2022
13 Jan 2023
31 Dec 2022
12 Jan 2023
31 Dec 2022
Amount
Erection of Main & Auxiliary Structure for 132 KV Bus extension/ new equipment for new 132/33 KV Transformer Bay including shifting of material Store to site, erection as per drawing using necessary nut-bolts & washers and fabricating/ modifying holes etc if required. i) BCT for 145KV CT - 03 Set ii) ALP for 120KV LA - 03 Set iii) ALP for 145KV BPI - 02 Set iv) BBLfor 145KV Line Isolator - 01 Set v) BBL for 145KV Bus Isolator - 01 Set vi) BTI for 145KV Tendom Isolator - 01 Set vii) ABL for 36KV Isolator - 02 Set viii) ALP for 30KV LA - 03 Set ix) ALP for 36KV CT - 03 Set x) DKR - 02 Set xi) AXM - 01 Set
Complete erection of following equipments as per instruction manual of various equipments and technical specifications including shifting of material / equipment from storage place to erection site with proper alignment, leveling etc. including all other associated work to complete the job satisfactorily. (for 01 No 132/33KV 40MVA T/F bay at 132KV S/S Kadipur
145 KV SF6 Circuit Breakers
36KV Circuit Breaker
145 KV Current Transformers Ratio ( 400-200/1A)
Junction box for 145KV CT
36 KV Current Transformers Ratio ( 800-400/1A)
Junction box for 36KV CT
145 KV Line Isolators with earth switc Manual
145 KV Bus Isolators without earth switch Manual
145 KV Tendom Isolators without earth switch Manual
145 KV Post Insulators for support
36KV Bus Isolator
120 KV Surge Arrestors
30 KV Surge Arrestors
Erection of Control & Relay Panels as per Technical Specification of NON SAS for 132/33KV 40MVA T/F C&R Panel including shifting from store to control room including grouting of panel and drelling hole for incoming cables at 132KV S/S Kadipur
Laying of following sizes of 1.1 KV Copper Control Cable in the cable trench from control & relay panel to various equipments/ marshalling boxes/ Junction Box etc in switchyard as per cable schedule along with its saddling at every 1000 mm distance with Alu. saddles of size 25x3 mm size including carriage of cable drums from store to laying site and all other associated works to complete the job satisfactorily as per technical specification and shifting back balance material to the store after completion of the work for 132/33KV 40MVA T/F Bay at 132KV S/S Kadipur
2 core * 2.5 sq. mm.
4 core * 2.5 sq. mm.
6 core * 2.5 sq. mm.
10 core * 2.5 sq. mm.
Erection of ABT Meter & its cubical also laying & termination of control cable from Transformer C&R Panel and commissioning work
Termination of Control Cable including cost of cable glands, lugs and ferrules complete and both end as per site and panel requirement for SAS 132 KV Feeder . Including supply of faruls & cable gland also cuuting drilling welding in 40 MVA T/F AT 132KV S/S Kadipur.
Stringing of Bus 03 Phase with specified ACSR Single Moose Conductor, Tension Fittings, Suspension Fitting and P.G. Clamp to complete the work as per technical specification (including cost of hoisting of insulator, cutting of conductor and shifting of all material from store to site (Gantry to Gantry LV Side of 40 MVA T/F AT 132KV S/S Kadipur)
Jumpering of various equipments in 132 KV Bays with specified Clamps and ACSR Panther Conductors from Line to LA, PT,CT Line, Bus& Tendom Isolators up to bus main & transfer bus of all three phases 132/33KV 40MVA T/F Bay at 132KV S/S Kadipur.
Earthing of equipments and structures by 50x6 mm size of M.S. Flat including digging of earth, cutting, bending, welding and painting of M.S. Flat by bus green paint (M.S. Flat will be provided by the department).
Laying of earth mat in whole switchyard on 6 mtr grid in length and width dimension of switch yard help of 40mm dia MS. Rod
Fabrication of 3 M. long, 40 mm diameter electrode with following M.S. Rod having 150 mm long conical shape and then its piercing vertically inside the ground with top 500 mm below ground level and its welding with earth mat excluding the cost of M.S. Bar.
Shifting of 33/0.4KV 250KVA Station T/F including dismentling of station transformer also shifting of out going cable of this t/f up to 50mtr new plinth of station transformer and erection comissioning of station transformer & T/F Fuse set.
V.P.Associates
HARE KRISHNA ENERGY PROJECTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .