| 1 | L1₹2.5 LAdmitted-Finance | ₹2.5 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TAPAS KUMAR MUKHERJEE L1 |
|---|---|---|---|---|
| 1.00Items Description | ||||
| 2.00Replacement of 2 Nos. of winding engine rope, removal of old rope and recapping of new rope of Dhemomain PIT Colliery under Sodepur Area. | ||||
| 2.01 | Dismantling & laying of new winding rope placed at substation to 2 no. pit. | 16 | Nos. | 1,500 ₹24,000 |
| 2.02 | Removal of U clamps, pulling the old winding rope from inside the winding drum, removal of entire old winding rope length 220 mtr & placing itto approx. 100 mtr awav. | 40 | Nos. | 1,500 ₹60,000 |
| 2.03 | Laying of new winding rope over the Headgear pully to inside the drum, pulling 110 ft rope inside the drum, clamping the rope. | 40 | Nos. | 1,500 ₹60,000 |
| 2.04 | Placing and positioning of winding rope inside Headgear Pulley grove during hauling the new winding rope, greasing of headgear. | 8 | Nos. | 1,500 ₹12,000 |
| 2.05 | Recapping of winding rope (Complete process) | 16 | Nos. | 1,500 ₹24,000 |
| 2.06 | Overhead cost and others | 1 | Nos. | 18,000 ₹18,000 |
| 2.07 | Add. CMPF/EPF @ 12% on Labour charges | 1 | Nos. | 21,600 ₹21,600 |
| 2.08 | Add. Bonus @ 8.33% on Labour charges 8.33% | 1 | Nos. | 14,994 ₹14,994 |
Updated dates
Tender Value
₹2.7 L
EMD Value
₹3,500
Closing Date
23 Mar 2026, 9:00 amClosed
Area Engineer(EnM)
Area Engineer(EnM), Sodepur Area
Replacement of 2 Nos. of winding engine rope, removal of old rope and recapping of new rope of Dhemomain PIT Colliery under Sodepur Area.
2026_ECL_356140_1
ECL/SDPA/AE(EnM)/e/25-26/397 dt.07.03.2026
Open Tender
Miscellaneous Works
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,500
26 Mar 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
10 Mar 2026 - 13 Mar 2026
Items Description
Replacement of 2 Nos. of winding engine rope, removal of old rope and recapping of new rope of Dhemomain PIT Colliery under Sodepur Area.
Dismantling & laying of new winding rope placed at substation to 2 no. pit.
Removal of U clamps, pulling the old winding rope from inside the winding drum, removal of entire old winding rope length 220 mtr & placing itto approx. 100 mtr awav.
Laying of new winding rope over the Headgear pully to inside the drum, pulling 110 ft rope inside the drum, clamping the rope.
Placing and positioning of winding rope inside Headgear Pulley grove during hauling the new winding rope, greasing of headgear.
Recapping of winding rope (Complete process)
Overhead cost and others
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_368992.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid