| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance Lowest rate quoted |
| 2 | L2₹1.1 Cr+₹40,356.08 (0.35%)Rejected-Finance | ₹1.1 Cr+₹40,356.08 (0.35%) | L2 | Rejected-Finance Highest rate quoted |
Tender Value
₹1.1 Cr
EMD Value
₹67,150
Closing Date
24 Mar 2025, 5:00 pmClosed
Executive officer
Executive officer, Arulmigu Viswanathaswamy Temple, Veppancherry, Thiruthuraipoondi Taulk, Thiruvarur District
Reconstruction Works in Arulmigu Vishwanathaswamy temple, Veppanchery, Thiruthuraipoondi Taluk, Thiruvarur District
2024_HRCE_511425_1
01-L-VSV-2024
Open Tender
Civil Works - Others
Lump-sum
365 days
Viswanathaswamy Temple, Veppancherry
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹67,150
25 Mar 2025
10 Jan 2025
25 Mar 2025
10 Jan 2025
24 Mar 2025
10 Jan 2025
10 Jan 2025 - 24 Mar 2025
Amount
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification
Supplying and filling with Sand and Gravel mix in 1: 3 ratio, filled up in 150mm layers with moisture percentage of 18% including cost and conveyance of Quarry Dust, gravel and all labour charges for filling ramming etc. complete with standard specifications
Supplying and filling in foundation, basement, etc with filling Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Providing and laying position,Standardised concrete mi M-20 Grade in accordance with IS :456-2000,using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 3250 kg/cum and maximum water cement ratio of 0.55,inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about(4.79 cu.m)7670 kg of sand ,but eculding cost of reinforcement grill and fabricating charges,centering and shuttering and also inculding laying, vibrating with mechanical vibrtors, finishing, curing,etc, complete complying with standred specification and ass directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds.(No separate payment will be made by theDepartment for the ecess usage of Materials)
A) For Foundation
B) For Super Structure
Brick work in Lime Mortar 1:2 using country Country bricks size 8 - 3/4"x4 1/4"x2 3/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
A) For Foundation
B) For Super Structure
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
A) For RCC works in foundation and basement such as pile cap, grid beam, plinth beam, raft beam, & slab, column base & footing, stair case steps etc.
B)For RCC surface of Columns and a small quantities such as sunshades,sill slabs, parapet cum drops, window boxing, fin projection etc
C)For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc
D)For Centering for curved surfaces of all RCC items of work
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Dome brick work in Lime Mortor 1:2 using country brick of size 83/4"x41/4"x2" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. ( AS per PWD data 1984 SI No.182 & S.No.29)
Laying Terrace Flooring With Two course of Flat Tile Tiles 15cmX15CmX12mm using Lime mortar (1:1.5) mixed with crude oil 10% by weight of cement used pointed with same oiled mortar. - 10 M3
Plastering with Lime Mortar 1:1.5,20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Plastering with Lime Mortar 1:1.5 (One Lime and One Point Five Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Cement Mortar 1:3
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles following size of size of approved quality set in Lime Mortar 1:2 (One Lime and Two Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Supplying and fixing of Flush door shutter using Teak wood frame of size 127mm x 76mm and Door shutters Single leaf in position using 35mm thick solid core Flush shutters with teak play on both sides with teak wood lipping alround including cost and labour for fixing the hold fasts and furniture fittings etc.,complete as directed by the departmental officers complying with standard specification
UPVC window specification : Suplaying fixing UPVC (un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat of wood primer in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works
Supplying and fixing mild steel grill for windows / Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint with zing chromet over the existing red oxide primer in all floor etc, complete complying with standard specifications
Providing & fixing rain water down fall pipes of 110mm dia pvc pipes with necessary shoes bends clamps screws nails etc complete with standard specifications.
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft.
Up to 25’ ht
Up to 15’ ht
Brick masonry Lime Mortar 1:2 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
A) Kalkaram Up to 15' ht.
B) Vimanam Up to 15' ht
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortar 1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
A) Kalkaram Up to 15' ht.
B) Vimanam Up to 15' ht
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in LM 1:1.5 finishing the same with LM 1:1.5 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing L.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder)
A) Sudhai size above 1' 0" up to 2' 6"
B) Sudhai size above 2' 6" up to 3' 6"
Supplying of cut stone for walls, Pillar, Pavukkal , Uthiram, Bodiyal and all works excluding labour charges but including cost and conveyance loding and unloding etc. complete with standard specification.
Labour charges for cut stone Asvapatham Sthampam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut Stone Pillar excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut Stone Nilaikkal (Nagapatham, Poo, Kodikarukku) excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Thani Bothiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Thani Uthiram excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2 ( S.I. No 358 )
Painting with Manicka pattai with terracotta two coats etc complete. complying standard specification
Providing & fixing rain water down fall pipes of 110mm dia pvc pipes with necessary shoes bends clamps screws nails etc complete with standard specifications.
Add GST 18%
S.Rajendran (BID ID -1277529)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_608069.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .