Tender Value
₹32.8 L
EMD Value
₹3.3 L
Closing Date
28 Sept 2026, 3:00 pm6d left
EE PWD Bijnor (HQ-Najibabad)
office of the EE PWD Bijnor (HQ-Najibabad)
Reconstruction work of Khairullapur to Puranpur Garhi road. (Including 05 years maintenance).
2026_CEMBD_1188502_8
1639/E-Tender/2026-27 Dt. 29.08.2026
Open Tender
Civil Works - Roads
Percentage
Najibabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹3.3 L
office of the EE PWD Bijnor (HQ-Najibabad)
22 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Water Bound Macadam Sub-base/base / 3) WBM Grading 3 / Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (A) By Manual Means. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. | 124 | Cum | 2,450 | ₹3,03,800 |
| 2 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. | 345 | Cum | 6,200 | ₹21,39,000 |
| 3 | Construction of Subgrade and Earthen Shoulders - Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST. | 360 | Cum | 90 | ₹32,400 |
| 4 | Routine Maintenance of road after completion work
(A) Carriageway/Pavement:
(a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC).
(B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation:
(a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches.
(C) Bridges and Culverts:
(a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs.
(D) Repair of Roadside Drains:
(a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4.
(E) Road Furniture:
(a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,.
Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance.
Payment of Maintenance work as Percentage of final Civil Construction Cost. | 0 | Km | - | - |
| 4.01 | For Ist Year @ 0.00 % for Cement Concrete road | 0.7 | Km | - | - |
| 4.02 | For IInd Year @ 0.25 % for Cement Concrete road | 0.7 | Km | - | - |
| 4.03 | For IIIrd Year @ 0.50 % for Cement Concrete road | 0.7 | Km | - | - |
| 4.04 | For IVth Year @ 0.75 % for Cement Concrete road | 0.7 | Km | - | - |
| 4.05 | For Vth Year @ 1.00 % for Cement Concrete road | 0.7 | Km | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.13 MB
BOQ_2238988.xls
BOQ • 0.24 MB
T108.pdf
Tender Documents • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .