| 1 | L1₹2.1 LAccepted-AOC AT DHORI G M COLONY DIST BOKARO JHARKHAND | BOKARO | BOKARO | JHARKHAND | L1 | Accepted-AOC awarded | |
| 2 | Rejected-Technical AT BATA GALI PHUSRO PO PHUSRO BAZAR DIST BOKARO | PHUSRO | BOKARO | - | Rejected-Technical not evaluated | |
| 3 | Rejected-Technical AT PATEL NAGAR PO PHUSRO BAZA DIST BOKARO | PHUSRO BAZA | BOKARO | - | Rejected-Technical not evaluated |
Tender Value
₹1.9 L
EMD Value
₹2,500
Closing Date
25 Dec 2023, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PE EnM AADOCM
PE EnM AADOCM
Erection of pole damaged lighting overhead line at different location in r/o AADOCM
2023_CCL_296366_6
AADOCM/EnM/2023-24/17
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
AADOCM
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
11 Mar 2024
18 Dec 2023
26 Dec 2023
19 Dec 2023
25 Dec 2023
19 Dec 2023
19 Dec 2023 - 22 Dec 2023
Amount
Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement: 3 courses and: 6 graded stone aggre 40 mm nominal size) foundation incl. excv. and refilling etc. a) installed at 60ton to 50ton road w/bridge-03 nos b) installed at f/breaker no o4 ramp -01nos c) near by swari pump sump atabonded for heightening of OH line Qr no-01
Providing RCC pole 8mtr lenth long for new OH line from PF-02 to swari for lighting and re-organization of damaged pole of Amlo Basti along with road. a) Installed at Karbala lighting line.02nos. b) Installed at f/breaker near w/bridge. 02nos c) near by swari pump sump atabonded for heightening of OH line Qr no-01
Erection of RCC pole of 08 mtr length in brick ballast and ramming the foundation , finishing with 150 mm thick cement concrete (1:3:6) layer on top with including excavation and refilling etc as required.
Transportation of rail pole & cement pole.
Erection of AA conductor of 7/2.11 mm to 7/3.00 mm dia meter & above including binding etc. as required 03span x 45 x 2 wire = 270mtrs. x 0.214 = 57.78kg., 04span x 35 x 3 wire = 420mtrs. x 0.214 = 89.88kg, 01spanx35 x 2wire=70mtr x.214kg=14.98kg,3span x40x 2wire=240mtr x.214kg=51.36kg,1span x 40x3wire=120mtr xx.214kgg=25.68kg, 1span x 40x2wire=80mtrx.214kg=17.12kg total-256.8kg
Supplying and erection of stay set complete (Galvanized) with 19/20 mm dia x 1.8 meters long stay rod, anchor plate of size 45 cm x 45 cm x 7.5 mm thimble stay clamps. Turn buckle (20 mm x 60 mm) 7/3.15 mm dia GI stay wire and strain insulator etc. in cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required.
Dismantling of over head lines comprising of copper/aluminium over head conductor, G.I wire, cross arms, insulators etc. as required. 03span x 45 x 2 wire = 270mtrs. x 0.214 = 57.78kg., 04span x 35 x 3 wire = 420mtrs. x 0.214 = 89.88kg, 01spanx35 x 2wire=70mtr x.214kg=14.98kg,3span x40x 2wire=240mtr x.214kg=51.36kg,1span x 40x3wire=120mtr xx.214kgg=25.68kg, 1span x 40x2wire=80mtrx.214kg=17.12kg total-256.8kg
Supply and erection of shackle insulator (100 mm x 110 mm) G.I. bolts and nuts straps etc as required.220v
Supply of 8 SWG GI wire (4.00 dia) 01 span x 40x3wire=120mtr x.132kg =15.84kg
Erection of cradle guard as required. 1 span by. 15 nos x 01span= nos
Dismantling of pole strut embedded in cement comcrete foundation etc. as required.
Supplying of channel iron 75 mm x 40 mm x 6 mm( 7.14 kg per mtr) cross arm for 2 wire O/H line complete with clamps, bolts and nuts etc. including drilling holes for insulator pins etc(as per drawing ) and painting with primer and finish paint as required.
Erection of angle iron/channel iron cross arm on steel tubular/rail pole etc. as required.
Total impact of GST for the purpose of CTC
M/S UNNATI ELECTRICAL WORKS
M/S P S ENTERPRISES
techsummary_306960.pdf
PDF • 0.78 MB
finsummary_306960.pdf
PDF • 0.78 MB
award17.6.pdf
PDF • 3.22 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .