Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.4 LAdmitted-Finance 0 BUDKIYA DEVATRA JODHPUR RAJASTHAN 342606 | JODHPUR | RAJASTHAN | 342606 | -1.05% | ₹24.4 L | L1 | Admitted-Finance |
| 2 | L2₹25.1 L+₹72,730.43 (2.98%)Admitted-Finance | +1.90% | ₹25.1 L+₹72,730.43 (2.98%) | L2 | Admitted-Finance |
Tender Value
₹24.7 L
EMD Value
₹49,309
Closing Date
23 Mar 2026, 6:00 pmClosed
EE PHED JAITARAN
EE PHED JAITARAN
Constt Comm of Open Well at Piped W SS Lambiya at Sub. Dn. Jaitaran under Div- Jaitaran.
2026_PHCJA_545335_1
EE PHED JAITARAN 108/2025-26
Open Tender
Civil Works - Water Works
Percentage
122 days
jaitaran
as per TD Documents
5 documents required · 5 mandatory
₹500
EE PHED Jaitaran
₹49,309
Yes
31 Mar 2026
11 Mar 2026
24 Mar 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | CONSTRUCTION OF OW - Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. All kind of soil | 57.7 | Cum | 314 | ₹18,117.8 |
| - | Earth work in excavation over areas (exceding 30cm depth, 1.5 mtr in width and I 0 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter Ordinary Rock | 169.56 | Cum | 674 | ₹1,14,283.44 |
| - | Earth work in excavation over areas (exceding 30cm depth, 1.5 mtr in width and I 0 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter Hard Rock (Requiring blasting) useful material 30% | 251.2 | Cum | 976 | ₹2,45,171.2 |
| - | Add extra over item No. 2.39.2- 4 for every additional lift of I .5 Mtr. Or part thereof: In Ordinary rock and hard rock.
S. No. From (m) To (m) Lift
1 01.50 03.00 1st | 18.84 | Cum | 67 | ₹1,262.28 |
| - | 2 03.00 04.50 2nd | 18.84 | Cum | 134 | ₹2,524.56 |
| - | 3 04.50 06.00 3rd | 18.84 | Cum | 201 | ₹3,786.84 |
| - | 4 06.00 07.50 4th | 18.84 | Cum | 268 | ₹5,049.12 |
| - | 5 07.50 09.00 5th | 18.84 | Cum | 335 | ₹6,311.4 |
| - | 6 09.00 10.50 6th | 18.84 | Cum | 402 | ₹7,573.68 |
| - | 7 10.50 12.00 7th | 18.84 | Cum | 469 | ₹8,835.96 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
TD108.pdf
Tender Documents • 5.86 MB
BOQ_972637.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .