Executive Engineer (OS)
Estate Office, CCS HAU, Hisar
Repair/renovation of main office gate and colony gate of KVK, Mahendergarh
2022_HRY_240107_1
3316-C
Open Tender
Civil Works
Works
60 days
CCS HAU
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹9,000
Yes
16 Feb 2023
19 Sept 2022
7 Oct 2022
19 Sept 2022
6 Oct 2022
19 Sept 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (HSR 4.14.1)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar (HSR 5.7.4)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded cum stone aggregate 40 mm nominal size) (HSR 6.1.6)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: (HSR 6.14.1) 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size) (HSR 6.15.1)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size). (HSR 6.16)
Reinforced cement concrete work in vertical and horizontal fins individually or forming box louvers, facias and eaves boards above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1 ½ coarse sand(zone-111) : 3 graded stone aggregate 20mm nominal size). (HSR 6.21)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (HSR 6.30.1)
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies (HSR 6.30.3)
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers (HSR 6.30.5)
Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts (HSR 6.30.6)
Centering and shuttering including strutting, propping etc. and removal of form for Vertical and horizontal fins individually or forming box louvers band, facias and eaves boards (HSR 6.30.13)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc.complete in all respect above plinth level. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, over1aps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. Thermo-Mechanically Treated bars of grade Fe-500D or more (HSR 6.34.6)
Brick work with common burnt clay non-modular bricks of class designation 10 .5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : Cement mortar 1:6 (1 cement: 6 coarse sand) (HSR 7.22.2)
Painting top of roofs with bitumen of approved quality @ 17kg per 10 impregnated with a coat of coarse sand at 60 cudm per 10 sqm, including cleaning the slab surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil complete With residual type petroleum bitumen of grade VG -10 (HSR 9.10.1)
10 cm thick (average) mud phaska of damped brick earth on roofs laid to slope consolidated and plastered with 25 mm thick mud mortar mixed with bhusa @ 35 kg per cum of earth and gobri leaping with mix 1: 1 (1 clay : 1 cow dung) and covered with flat tile bricks, grouted with cement mortar 1: 3 (1 cement: 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement and finished neat: With common burnt clay non-modular brick tile of class designation 10 (HSR 9.11.1)
Pointing on tile brick work with cement mortar 1 :3 (1 cement : 3 fine sand): Flush/ Ruled/ Struck or weathered pointing (HSR 11.26.1 )
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. (HSR 11.60)
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer (HSR 11.67.1)
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 litre/1 O sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (HSR 11.95.1)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (HSR 13.29.2)
Providing and fixing at all height University name in English letters made of 3 mm thick acrylic words of required height (30 units) with LED light including cost of electric wires, connectors, tape, nuts, bolts etc. complete in all respect as directed by Enginer-in-charge. (NS)
Providing and fixing at all height University round Logo of 30'' dia made of 3 mm thick acrylic sheet with LED light including cost of electric wires, connectors, tape, nuts, bolts etc. complete in all respect as directed by Engineer In-Charge. (NS)
Amarjeet Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .