Loading…
Loading…
Tender Value
₹31.3 L
EMD Value
₹62,520
Closing Date
22 Jun 2026, 4:00 pm
Executive Engineer
Executive Engineer Thathri
construction of 03 ACR at UPS Doki samagra shiksha
2026_PWDJK_311378_4
e-NIT NO. 12 OF 2026-27
Open Tender
Civil Works
365 days
Thathri
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer PWD Division Thathri
₹62,520
Yes
2 Jun 2026
2 Jun 2026
23 Jun 2026
2 Jun 2026
22 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 21.24 | cum | 592.9 | ₹12,593.2 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :1 meter from cutting edge | 85.09 | cum | 479.3 | ₹40,783.64 |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 0.0 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 20.12 | cum | 5,202.9 | ₹1,04,682.35 |
| 0.0 | 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 8.67 | cum | 7,275.25 | ₹63,076.42 |
| 0.9 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)with 20% boulders | 72.81 | cum | 4,774.46 | ₹3,47,628.43 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 0.9 | Foundations, footings, bases of columns etc. for mass concrete. | 218.87 | sqm | 286.35 | ₹62,673.42 |
| 0.0 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 84.61 | sqm | 577.55 | ₹48,866.51 |
| 0.9 | Suspended floors, roofs, landings, balconies and access platforms | 46.18 | sqm | 723.2 | ₹33,397.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_1008303.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid