| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.6 LAccepted-AOC 46 A MAHALIAMMAN KOVIL STREET VETTAIKARANPUDUR POST POLLACHI TALUK COIMBATORE DISTRICT 642 129 | COIMBATORE | TAMIL NADU | 642129 | ₹7.6 L | 1 | Accepted-AOC Lowest Amount Quoted |
| 2 | 2₹7.6 LRejected-Finance | ₹7.6 L | 2 | Rejected-Finance Highest Quoted |
| Sl No | Description | Qty | Unit | RAMASAMY AND SONS L1 | K NANDHAGOPAL L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work exception for foundation in all solids and sub-solids to full depth as may be directed except in hard rock requiring blasting but inclusive shoring, structing and baling out water wherever necessary and filling the sides of foundation with excavated earth in layer of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the department officers with initial lead and lifts etc. including leaving the sites complete complying with standard specifications etc complete. Coloumn | 18 | M3 | 263.5 ₹4,743 | 270 ₹4,860 |
| 2.00 | Supplying and filling in foundation and basement with good,clean dry Msand in layers not more than 15Cm. thick well ramming, watering and compacted etc complete complying with standard specification For Basement | 2 | M3 | 1,701 ₹3,402 | 1,710 ₹3,420 |
| 3.00 | Collection supply and filling of well gravel filling approved quarry including cost and Conveyance of all materials to site and all labour charges for filling etc., Complete. For Basement | 5 | M3 | 271 ₹1,355 | 280 ₹1,400 |
| 4.00 | Cement concrete 1:4:8 Mix(One Cement,four MSand, eight jelly) using 40 mm ISS Gauge HBG Metal including cost and conveyance of all materials to the work site including all labour charges for mixing,laying,ramming,consolidation and curing etc., complete as per standard specifications. For Column | 5 | M3 | 5,358 ₹26,790 | 5,365 ₹26,825 |
| 5.00 | Supplying and erecting in the position of centering for sides and soffits including necessary supports and strutting upto 3.00 m high for plain surfaces with all cross bracings using mild steel sheet of 90 mm x 60 cm and or suitable size stiffened with welded-mild steel angle of size 2mmx25mmx3 mm for boarding laid over silver oax (country wood) joists of size 10 x cm x 6.5 cm spaced at about 90 cm centre to centre and supported by casurina props 10 mm to 13 cm dia spaced at about 75 cm center to center etc. complete complying with standard specifications and as directed the departmental office for RCC slabs, rectangular beams, Tee or Ell beams, Lintels bed blocks, staircase waist slab and landing slab, landing beams canopy etc. For Column | 24 | M2 | 1,302 ₹31,248 | 1,310 ₹31,440 |
| 6.00 | For Grade beam Outter Allround Inner | 24 | M2 | 525 ₹12,600 | 530 ₹12,720 |
| 7.00 | For Slab Beam bottom Beamside sunshade bottom slab bottom Sunshade sides Allround | 59 | M2 | 1,302 ₹76,818 | 1,310 ₹77,290 |
| 8.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - A) UP to Basement | 5 | M3 | 8,361 ₹41,805 | 8,365 ₹41,825 |
| 9.00 | B) Above Basement Coloumn Beam Slab | 9 | M3 | 8,502 ₹76,518 | 8,510 ₹76,590 |
| 10.00 | Supplying, Fabricating and placing in position TMT bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete complying with standard specifications and drawings and as directed by the departmental Engineers. | 1,250 | Kg | 91.8 ₹1.1 L | 93 ₹1.2 L |
Tender Value
₹9.3 L
EMD Value
₹9,300
Closing Date
25 Feb 2026, 3:00 pmClosed
Executive Officer
Town Panchayat Office, Thirumalayampalayam
construction of Passenger Shelter at Ward no 7 Rottigoundenur area Thirumalayampalayam Town Panchayat
2026_DTP_657446_1
76-3/2026/A1
Open Tender
Civil Works - Others
180 days
Thirumalayampalayam
As per norms
2 documents required · 2 mandatory
₹0
₹9,300
17 Apr 2026
14 Feb 2026
25 Feb 2026
14 Feb 2026
25 Feb 2026
14 Feb 2026
14 Feb 2026 - 25 Feb 2026
Earth work exception for foundation in all solids and sub-solids to full depth as may be directed except in hard rock requiring blasting but inclusive shoring, structing and baling out water wherever necessary and filling the sides of foundation with excavated earth in layer of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the department officers with initial lead and lifts etc. including leaving the sites complete complying with standard specifications etc complete. Coloumn
Supplying and filling in foundation and basement with good,clean dry Msand in layers not more than 15Cm. thick well ramming, watering and compacted etc complete complying with standard specification For Basement
Collection supply and filling of well gravel filling approved quarry including cost and Conveyance of all materials to site and all labour charges for filling etc., Complete. For Basement
Cement concrete 1:4:8 Mix(One Cement,four MSand, eight jelly) using 40 mm ISS Gauge HBG Metal including cost and conveyance of all materials to the work site including all labour charges for mixing,laying,ramming,consolidation and curing etc., complete as per standard specifications. For Column
Supplying and erecting in the position of centering for sides and soffits including necessary supports and strutting upto 3.00 m high for plain surfaces with all cross bracings using mild steel sheet of 90 mm x 60 cm and or suitable size stiffened with welded-mild steel angle of size 2mmx25mmx3 mm for boarding laid over silver oax (country wood) joists of size 10 x cm x 6.5 cm spaced at about 90 cm centre to centre and supported by casurina props 10 mm to 13 cm dia spaced at about 75 cm center to center etc. complete complying with standard specifications and as directed the departmental office for RCC slabs, rectangular beams, Tee or Ell beams, Lintels bed blocks, staircase waist slab and landing slab, landing beams canopy etc. For Column
For Grade beam Outter Allround Inner
For Slab Beam bottom Beamside sunshade bottom slab bottom Sunshade sides Allround
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - A) UP to Basement
B) Above Basement Coloumn Beam Slab
Supplying, Fabricating and placing in position TMT bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete complying with standard specifications and drawings and as directed by the departmental Engineers.
Brick work in cement mortor 1:5 (One cement five Msand) using well burnt Second class Table moulded chamber burnt bricks of size 9"x4 3/8"x2 3/4" all cost and conveyence of material to the site and all labour charges including curing etc complete complying with standard specification. Up to Basement
Above Basement Backside Deduction for coloumn
Plastering with cement mortar 1:3 (one cement and three Msand) 10mm thick in all floors including curing etc., complete complying with standard specification and as directed.
Plastering with cement mortar 1:5 (one cement and five Msand) 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.
Paving the floor with descrgned coloured vitrified tiles of size 600 x 600 x 8mm of best quality and approved variety complying / confirming ISI specification land over cement mortar 1:3 (one cement and three sand) 20mm thick and pomted with same coloured cement neatly etc., complete.
Dadoing the walls with glazed tiles of 300x200x6mm size and any colour laid in Cement mortar 1:2 (one cement and Two Msand)10 mm thick and pointing with white cement 0.40kg/sq.m mixed with colouring pigments to suit the colour of the tiles including finishing the joints neatly complying with standard specification and as directed by the departmental officers.The glazed tiles should be got approved from departmental officers before execution.
Provding and finishing over slopped RCC roof or Sunshade with one course of Ornamental tiles of size 23 x 15 x1.2cm for front elevation laid with c.m 1:3 (one cement three Msand) 20mm thick and pointed with same mortar mixed with red oxide and WPC at the rate of 2% by weight of cement including neatly finishing etc., complete as per standard specification (The colour and make of the tiles should be approved before execution from the deparmental officers)
Laying with new C.C. Laminated tiles (Like Dora tiles Eurocon tiles etc),(anti skid) of 20mm thick of approved spl quality and set in Cement Mortar 1:3 (1 of cement and 3 of sand ) 20mm. Thick using river sand and pointing with colour cement using at the rate of 0.40 kg/M2 and mixing with colour pigment at the rate of 0.3 Kg/M2 including finishing complete with Standard Specification and as directed by the Departmental Officers etc.,
Rubberised Interlocking Paver Block M40 grade providing and laying of 80mm thick heigh strength type confiriming IS 15658 - 2006 of Rubberised Interlocking Paver Block in required size of mininmum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flumying bore pattern with approved nin - sticking surface in the top and the rate including levelling the base cushion 150mm thick laying out the pavement cut the pieus to fit edge, vibrating pavers, sweeping transporting leading unloading as per standard specification.
Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications.
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between. The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc.complete
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated single core unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5A FT switch and making good of the concealed portion with suitable colour for PVC concealed light / fan Point (for electronic regulator) (5 points per coil) (SD. 25).
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_788513.pdf
finsummary_788513.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_788513.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid