Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹150.1 CrAdmitted-Finance 16 EDEN GARDEN CHUNA BHATTI KOLAR ROAD BHOPAL | BHOPAL | MADHYA PRADESH | ₹150.1 Cr | L1 | Admitted-Finance |
| 2 | L1₹150.1 CrAdmitted-Finance | ₹150.1 Cr | L1 | Admitted-Finance |
| 3 | L2₹157 Cr+₹6.9 Cr (4.57%)Admitted-Finance | ₹157 Cr+₹6.9 Cr (4.57%) | L2 | Admitted-Finance |
| 4 | L3₹159.3 Cr+₹9.1 Cr (6.08%)Admitted-Finance C 21 SUSHANT LOK 3 SECTOR 57 122001 | GURUGRAM | HARYANA | 122001 | ₹159.3 Cr+₹9.1 Cr (6.08%) | L3 | Admitted-Finance |
| 5 | L4₹159.5 Cr+₹9.4 Cr (6.25%)Admitted-Finance 3 A AGRAWAL NAGAR INDORE M P 452001 | INDORE | INDORE | MADHYA PRADESH | 452001 | ₹159.5 Cr+₹9.4 Cr (6.25%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIWALAY INFRA PROJECTS PVT LTD L7 | B R GOYAL INFRASTRUCTURE LIMITED L4 | AK SHIVHARE INFRASTRUCTURE PVT LTD L1 | RATNA INFRASTRUCTURE PROJECTS PVT LTD L4 | R K JAIN INFRA PROJECTS PVT. LTD. L3 | Credible Engineering Construction Projects Limited L4 | Bharat Spun Pipe and Construction Company L4 | JKM INFRA WORKS LLP L6 | TCC-AIL(JV) L4 | M/s Sri Ram Enterprises L2 | P and R Infraprojects Ltd L4 | PH ADAI L5 | Evergreen Infrabuild Pvt. Ltd. L4 | Nidhi Creative Infrastructure Pvt Ltd L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | “Construction of Two laning with Hard shoulder road of Ukhrul – Toloi - Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode” | 1 | Lumpsum | 2,12,00,00,000 ₹2,12,00,00,000 | 1,59,52,80,000 ₹1,59,52,80,000 | 1,50,14,40,000 ₹1,50,14,40,000 Lowest | 1,59,52,80,000 ₹1,59,52,80,000 | 1,59,28,00,000 ₹1,59,28,00,000 | 1,59,52,80,000 ₹1,59,52,80,000 | 1,59,52,80,000 ₹1,59,52,80,000 | 1,95,18,72,000 ₹1,95,18,72,000 | 1,59,52,80,000 ₹1,59,52,80,000 | 1,57,00,00,000 ₹1,57,00,00,000 | 1,59,52,80,000 ₹1,59,52,80,000 | 1,69,28,73,600 ₹1,69,28,73,600 | 1,59,52,80,000 ₹1,59,52,80,000 | 1,50,14,40,000 ₹1,50,14,40,000 Lowest |
Tender Value
₹263.5 Cr
Closing Date
5 Aug 2021, 3:00 pmClosed
K C Bhatt
National Highways and Infrastructure Development Corporation Ltd. Third Floor, PTI Building, 4 Sansad Marg. New Delhi
Construction of Two laning with Hard shoulder road of Ukhrul - Toloi - Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) Manipur
2021_NHIDC_635133_1
NHIDCL/Manipur/NH- 102A/UTT/2021/PKG-4
Open Tender
Civil Works
EPC Contract
2372 days
Manipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
27 Aug 2021
22 Jun 2021
6 Aug 2021
22 Jun 2021
5 Aug 2021
29 Jul 2021
22 Jun 2021 - 7 Jul 2021
12 Jul 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | “Construction of Two laning with Hard shoulder road of Ukhrul – Toloi - Tadubi section of NH-102A from Design Chainage 81.870 Km to 105.825 Km (Package 4) in the State of Manipur on EPC mode” | 1 | Lumpsum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
RFP.pdf
Tender Documents • 2.72 MB
DCA.pdf
Tender Documents • 2.35 MB
BOQ_668482.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .