| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC AT NUAPADA NAYABAZAR CUTTACK 753010 | CUTTACK | ODISHA | 753010 | ₹5.9 L | L1 | Accepted-AOC SUCCESSFUL BIDDER |
| 2 | L2₹6.4 L+₹50,757.75 (8.58%)Rejected-Finance AT DARKHAPATNA PO MADHUPATNA CUTTACK ODISHA PIN 753010 | CUTTACK | CUTTACK | ODISHA | 753010 | ₹6.4 L+₹50,757.75 (8.58%) | L2 | Rejected-Finance TECHNICALLY RESPONSIVE BUT L2 BIDDER |
Tender Value
₹7.8 L
EMD Value
₹7,800
Closing Date
17 Jun 2026, 5:30 pmClosed
SUPERINTENDING ENGINEER, MECHANICAL DIVISION, BBSR
O/o THE SUPERINTENDING ENGINEER, MECHANICAL DIVISION, BBSR
Renovation of 2 nos HR gates and its hoist accessories and repair, maintenance of the walkway bridge of Mahinsanala MIP of Dasapalla Block under Superintending Engineer, Minor Irrigation Division, Nayagarh for the year 2026-27.
2026_CEMWR_131371_1
SE/MDB-03(C)/W/2026-27
Open Tender
Mechanical Works
Percentage
30 days
Mahinsanala, Daspalla
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹7,800
6 Aug 2026
8 Jun 2026
18 Jun 2026
8 Jun 2026
17 Jun 2026
8 Jun 2026
8 Jun 2026 - 17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply cost of structural steel and rolled steel materials of Embedded parts consisting of seal beam, guide, track arrangement etc. suitable for vent size of 1200mm x 1100mm and maximum guide length of about 3000mm for 02 nos. of gates including 5% wastage material complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 409.44 | kg | 79.21 | ₹32,431.74 |
| 2 | Fabrication cost of the above mentioned embedded parts with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables,complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 516.48 | kg | 41.53 | ₹21,449.41 |
| 3 | Supply cost of structural steel and rolled steel materials of vertical gate consisting of skin plate, end vertical girders, horizontal girders, bronze pads, lifting brackets, seal arrangements etc. suitable for vent size of 1200mm x 1100mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 424.2 | kg | 79.21 | ₹33,600.88 |
| 4 | Fabrication cost of the above mentioned gate leaf with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables, complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge.. | 431.58 | kg | 64.82 | ₹27,975.02 |
| 5 | Supply cost of structural steel and rolled steel materials of Steel Hoist Bridge consisting ofmain beams, base plates etc. suitable for vent size of 1200mm x 1100mm complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 1,091.1 | kg | 79.21 | ₹86,426.03 |
| 6 | Fabrication cost of the above mentioned steel hoist bridge with all accessories including machinery, fixtures, labour, cutting, aligning, welding, cleaning, finishing, including consumables, complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 1,096.78 | kg | 23.82 | ₹26,125.3 |
| 7 | Supply cost of Restraining arrangements consisting of main beam, supporting angle for beam, brackets, stiffners, c clamp and bush with all accessories including machineray, fixture, labour, cutting, alligning,welding, cleaning, finishing including consumables all complete as per specification with all lead & lifts excluding boughtout items. | 101.76 | kg | 79.21 | ₹8,060.41 |
| 8 | Fabrication cost of Restraining arrangements consisting of main beam, supporting angle for beam, brackets, stiffners, c clamp and bush with all accessories including machineray, fixture, labour, cutting, alligning,welding, cleaning, finishing including consumables all complete as per specification with all lead & lifts excluding boughtout items. | 98.92 | kg | 23.82 | ₹2,356.27 |
| 9 | Erection, positioning, aligning, fixing, trial and commissioning including unloading and shifting upto location of all components 1st. Stage and 2nd. Stagge embedded parts, vertical gate leaf, steel hoist bridge assembly, with all accessories including machinery, labour, fixture, cutting, aligning, welding, cleaning, finishing complete in all respects with all leads and lifts for smooth operation as per specification and direction of engineer-in-charge. | 2,143.76 | kg | 52.04 | ₹1,11,561.27 |
| 10 | 80mmX30mmX12mm Bronze Pad | 8 | kg | 303.8 | ₹2,430.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
DTCN.pdf
Tender Documents • 1.60 MB
BOQ_595031.xls
BOQ • 0.27 MB
Clausedeleted.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .