Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Fee/PreQual/Technical/Finance TIRUNELVELI | TAMIL NADU | 627001 | ₹4.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.1 L+₹10,211.36 (2.55%)Admitted-Fee/PreQual/Technical/Finance | ₹4.1 L+₹10,211.36 (2.55%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Venkateswara Traders L2 | S Sasikumar L1 |
|---|---|---|---|---|---|
| 1.00Construction of Mini CSC in Kurumberi Primary School at Kurumberi Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 13.36 | cum | 205 ₹2,738.8 Lowest | 217 ₹2,899.12 |
| 3.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specification | 0.49 | cum | 2,047 ₹1,003.03 | 1,635 ₹801.15 Lowest |
| 4.00 | Collection and supply of Gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specification | 0.83 | cum | 1,104 ₹916.32 | 192 ₹159.36 Lowest |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 2.04 | cum | 5,167 ₹10,540.68 | 4,732 ₹9,653.28 Lowest |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 14.31 | cum | 5,026 ₹71,922.06 Lowest | 5,098 ₹72,952.38 |
| 7.00Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete | |||||
| 8.00 | BGL | 12.17 | No | 500 ₹6,085 | 450 ₹5,476.5 Lowest |
| 9.00 | AGL | 26.6 | sqm | 500 ₹13,300 Lowest | 901 ₹23,966.6 |
| 10.00Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | |||||
Tender Value
₹4.8 L
EMD Value
₹9,660
Closing Date
22 Sept 2026, 3:00 pmClosed
Block Development Officer (V.P)
Kandhili Block
Construction of Mini CSC in Kurumberi Primary School at Kurumberi Panchayat Package 12
2026_RDTN_699586_1
B7/1737/2026
Open Tender
Civil Works
Item Wise
180 days
Kandhili Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,660
22 Sept 2026
31 Aug 2026
22 Sept 2026
31 Aug 2026
22 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Mini CSC in Kurumberi Primary School at Kurumberi Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 13.36 | cum | - | - |
| 3 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specification | 0.49 | cum | - | - |
| 4 | Collection and supply of Gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specification | 0.83 | cum | - | - |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 2.04 | cum | - | - |
| 6 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 14.31 | cum | - | - |
| 7 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete | - | - | - | - |
| 8 | BGL | 12.17 | No | - | - |
| 9 | AGL | 26.6 | sqm | - | - |
| 10 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | - | - | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.57 MB
Tendernotice_2.pdf
PDF • 0.94 MB
BOQ_840988.xls
BOQ • 0.27 MB
SBMPostpond.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .