| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC | L1 | Accepted-AOC Accepted due to lowest rates | |
| 2 | L2₹14.7 L+₹45,624.20 (3.20%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
₹10.3 L
EMD Value
₹20,700
Closing Date
14 Feb 2022, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Balance work Construction of Parking at Devnagar in ward No 29 Vikas Ngar under AMRUT
2022_MC_56476_2
247Dated31012022
Open Tender
Civil Works
Item Rate
90 days
Shimla
Please refer Tender Documents
7 documents required · 7 mandatory
₹500
Executive Engineer R B M C Shimla
₹20,700
24 Mar 2022
7 Feb 2022
15 Feb 2022
7 Feb 2022
14 Feb 2022
7 Feb 2022
Amount
Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres.
Providing from work with steel plates 3.15 mm thick welded with angle iron in frame 30*30*5mm so as to give a fair finish including centring , shuttering and propping etc.with wooden battens height of propping and centring below supporting floor to ceiling upto all heights and removal of the same for insitu -reinforced concreate & plain concreate work in:-. Foundation , footing basis of coulmn etc. and mass concrete.
Flat surfaces such as soffits of suspended floors, roofs ,landings and the like Floor etc. up to 200 mm in thickness
Coulmn , pillars , post and struts:-
Beams , cantilever , grinders and lintels:- Sides and soffits of beams beam haunching cantilevers , brssumers and lintels not exceeding 1 metre in depth in all heights from floor
Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in foundation and plinth with in all leads , lifts of materials and other incidentals.
Providing and laying cement concrete 1:1:2 (1 cement : 1 sand :2 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement in reinforced concrete work in : Foundation And Plinth
Suspended floors roofs, landing and shelves and their supports , balconies, beams, griders, bressumers and cantilivers upto floor two level.
Lintels, beams girders bressumers and cantilevers up to floor two level :
Column, pillars, posts and struts upto floor two level :
Providing mild steel/Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete up to floor two level:
Cement concrete flooring 1:2:4 laid in one layer finished with a floating coat of neat cement including carriage of materials withinn all leads and lifts.40 mm thick
Vinod Thakur
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .