Loading…
Loading…
Tender Value
₹8.3 L
EMD Value
₹82,753
Closing Date
3 Aug 2026, 3:00 pm
chief engineer
chief engineer
Construction of nali and cc road from marshal pathology lab to sant clinic and sahayak galiya for manakmau society at ward no. 26
2026_NNSAH_1170406_1
6196 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
₹82,753
20 Jul 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old damage cc road including labour T&P etc all complete. | 291.5 | sqm | 38 | ₹11,077 |
| 2 | Disposal of malwa upto 5km including loading and unloading labour T&P etc in all work complete. | 29.15 | cum | 130 | ₹3,789.5 |
| 3 | Dismenteling of old brick work including labour T&P etc all complete (S.I. no 692) | 8.46 | cum | 400 | ₹3,385.6 |
| 4 | Deduction cost of old brick bat | 5.08 | cum | 800 | ₹4,064 |
| 5 | Deduction cost of old brick | 1,557.38 | no | 5.8 | ₹9,032.78 |
| 6 | Earthwork in cutting or in embankment in ordinary soil in all complete as per S.I. No. 251-a | 133.35 | m3 | 255 | ₹34,004.25 |
| 7 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work | 16.45 | m3 | 2,985 | ₹49,103.25 |
| 8 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. | 36.84 | m3 | 4,520 | ₹1,66,516.8 |
| 9 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 172.2 | m2 | 160 | ₹27,552 |
| 10 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. | 6.67 | m3 | 5,750 | ₹38,352.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.28 MB
BOQ_2196210.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].