| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.4 CrAccepted-AOC | ₹23.4 Cr | L1 | Accepted-AOC lowest bid received |
| 2 | L2₹28.0 CrRejected-Finance | ₹28.0 Cr | L2 | Rejected-Finance not a L1 bidder |
| 3 | L3₹31.8 CrRejected-Finance | ₹31.8 Cr | L3 | Rejected-Finance not a L1 bidder |
| 4 | L4₹32.0 CrRejected-Finance | ₹32.0 Cr | L4 | Rejected-Finance not a L1 bidder |
| 5 | L5₹32.8 CrRejected-Finance | ₹32.8 Cr | L5 | Rejected-Finance not a L1 bidder |
Tender Value
₹29.7 Cr
EMD Value
₹29.7 L
Closing Date
19 May 2025, 1:00 pmClosed
VC and MD
8 Floor World trade center 1 cuffe parade Mumbai 400005
Construction of Apron Link Taxiway AGL Road works and Storm Water Drainage at Ratnagiri Airport
2025_MADC_1173896_1
MADC/Ratnagiri Airport/2025/Tender/Apron/Road
Open Tender
Civil Works - Roads
300 days
Ratnagiri Airport
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹29.7 L
Yes
MADC Mumbai
28 Jul 2025
25 Apr 2025
20 May 2025
25 Apr 2025
19 May 2025
6 May 2025
5 May 2025
Amount
Engineering, Procurement, Construction of Apron, Link Taxiway, AGL, Road works and Storm Water Drainage including site preparation works, 2 years Defect Liability Period at Ratnagiri Airport as per Master plan, Specifications, Codes & Practices contained in the Tender Document. The design of facilities shall confirm to standard specified by FAA, ICAO, DGCA, AAI, MORTH, IRC, NBC, CPWD, IS etc. wherever required and in conformity with ATM / CNS / IMD / BCAS regulations regarding permissible heights, locations requirements etc. i/c all other works covered under Scope of work and meeting all relevant statutory requirements complete as required. Construction of the Project/Work on the Site set forth in Schedule A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D and Special Conditions of Contract, if any. Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Agreement General Requirements – Cost of Preliminaries, Mobilization, Site Management including Provisions of Work Programme under the Contract, Safety & Environmental Management, Statutory Requirements, Insurances & Bank Guarantees, Temporary Site Office & Labour Camp/ Facilities, Provision of Drawings/ Testing & Commissioning Procedures/ O & M Manuals/ Quality Assurance Plan etc all as per the contract including establishment and removal of all temporary facilities as per the requirements of MADC and Statutory Agencies standards
Construction of Apron, Link Taxiway (Rigid Pavement) and AGL works
Construction of Road Works - Internal roads and Paved surface for Car parking area,PTB, Utility building area, GSE and STP area (Flexible Pavement)
Storm water drainage work of Airside and Internal roads
Construction of Approach Road (Flexible pavement) and its associated storm water drainage work
RAJ PATH INFRACON PVT LTD (BID ID -6663241)
RDSamant Contractors Pvt Ltd (BID ID -6656802)
Nyati Engineers And Consultants PVT Ltd (BID ID -6670545)
J M Mhatre Infra Pvt Ltd (BID ID -6651120)
Harsh Constructions Pvt Ltd (BID ID -6670420)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid