| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical H NO A 312 YAMUNAPURAM DISTT BULANDSHAHAR | HATHRAS | UTTAR PRADESH | 203001 | Accepted-Technical Accepted |
| 2 | Accepted-Technical GRAM HAZRATPUR PO SAHKARI NAGAR DISTRICT BULANDSHAHR | BULANDSHAHR | BULANDSHAHR | UTTAR PRADESH | Accepted-Technical Accepted |
| 3 | Accepted-Technical VILLAGE UMARIYA LAKHMAPUR SWAIJPUR HARDOI UP 241001 | HARDOI | HARDOI | UTTAR PRADESH | 241001 | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
₹1.5 Cr
EMD Value
₹9.7 L
Closing Date
7 Oct 2026, 12:00 pmClosed
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
New construction work of Agauta Market to Kisoli link road
2026_CEMRT_1191148_5
9578/96M/E-Tender/Bsr Circle/2026-27 Dt. 22.09.2026
Open Tender
Civil Works - Roads
Percentage
180 days
Bulandshahar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹9.7 L
SE BSR Circle PWD Bulandshahr
12 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
30 Sept 2026 - 1 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 10,200 | Cum | 111 | ₹11,32,200 |
| 2 | Providing, laying and speading material on a prepared sub grade, adding cement @ 2% by weight to the spread materaial manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 950 | Cum | 4,190 | ₹39,80,500 |
| 3 | Cement Treated Sub base
(Cement Treated Sub base) Providing, laying and spreading in uniform layers with motor grader on a prepared sub base cement @4% by wt. to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined copmressive strength to form a layer of Sub-base. Including cost of all material, labour, T&P and royalty but excluding cost of GST. | 900 | Cum | 4,970 | ₹44,73,000 |
| 4 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30kg per sqm on the prepared granular/Bituminous surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST. | 9,180 | Sqm | 24 | ₹2,20,320 |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. But excluding GST. | 9,180 | Sqm | 235 | ₹21,57,300 |
| 6 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. | 9,180 | Sqm | 91 | ₹8,35,380 |
| 7 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. | 50.76 | Cum | 189 | ₹9,593.64 |
| 8 | Providing concrete for plain/reinforced concrete Grade M10 (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 13.99 | Cum | 6,965 | ₹97,440.35 |
| 9 | Brick masonry work in cement mortar (1:4) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 26.9 | Cum | 6,700 | ₹1,80,230 |
| 10 | Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST.MORD Specifications 1106 | 15 | Rm | 1,800 | ₹27,000 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_2246026.xls
BOQ • 0.37 MB
T2.pdf
Tender Documents • 1.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .