Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC AT PO RANGAMATI PODDARDIH NIRSA DIST DHANBAD JHARKHAND 828205 | DHANBAD | JHARKHAND | 828205 | ₹9.6 L | L1 | Accepted-AOC Lowest rate quoted by L1 (md. rejjak ansari) |
| 2 | L2₹10.1 LRejected-Finance DHANBAD | DHANBAD | DHANBAD | JHARKHAND | ₹10.1 L | L2 | Rejected-Finance Lowest rate quoted by L1 (md. rejjak ansari) |
| 3 | L3₹10.8 LRejected-Finance DHANBAD | ₹10.8 L | L3 | Rejected-Finance Lowest rate quoted by L1 (md. rejjak ansari) |
| 4 | L4₹10.8 LRejected-Finance | ₹10.8 L | L4 | Rejected-Finance Lowest rate quoted by L1 (md. rejjak ansari) |
Tender Value
₹12.8 L
EMD Value
₹25,700
Closing Date
12 Mar 2026, 5:00 pmClosed
EXECUTIVE ENGINEEER
MID DHANBAD
Renovation of Sarkari bandh Vill-polkera Panchayat-pandrabejra block- purvi tundi dist- Dhanbad
2026_WRD_110827_1
DMFT/MIR/DHN/F2-38/25-26/GR-09
Open Tender
Civil Works
90 days
purvi tundi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹25,700
Yes
4 Jul 2026
6 Mar 2026
14 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance in Borrow area, building premises flanks and slopes on the roads, canals and embankement by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of E/I (Vide Item No. 5.1.3.1 Part - B/ 2.02 Part - A | 0.16 | Ha | 19,760.3 | ₹3,161.65 |
| - | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with Kankar, Pebbles and Boulders up to 300 MM size and disposal of spoil up to 10 Mtr. With all lifts all complete as per specification and direction of E/I. (WRD 7.1.43.1) | 1,402.31 | cum | 50.53 | ₹70,858.72 |
| - | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with Kankar, Pebbles and Boulders up to 300 MM size and disposal of spoil up to 500 Mtr. With all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. (WRD 7.1.43.2) | 7,946.44 | cum | 105.09 | ₹8,35,091.38 |
| - | Hire Charges of 10 HP disel Operated pump for bailing out water from foundation trenches where necessary including cost of fuel , pay of operator with depriciation and major repair including profit (pump supplied by agency)- all complete as per direction of E/I { SOR Item code PM-29 pg 82 part A} ( CP+OH) | 35 | per Hr. | 344.85 | ₹12,069.75 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).BCD-5.3.1.2 | - | M3 | 4,598.23 | - |
| - | Providing designation 75B brick work in C.M (1:6 ) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar, joints cost of screening materials raking out joints to 15mm depth , curring , taxes and royalty all complete as per builiding specification and direction of E/I. (BCD 5.2.6) | - | M3 | 5,110.26 | - |
| - | Providing 12mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. (BCD 5.7.2) | - | M2 | 174.07 | - |
| - | Providing 1.5mm cement punning including curing, carriage of water with all leads and lift as per building specification and direction of E/I. (BCD 5.7.11) | - | M2 | 54.43 | - |
| - | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. (5.1.1) | - | .M3 | 151.82 | - |
| - | Extra for earth work in hard soil as per specification and dir- ection of E/I.(Vide classification of soil item-B) (5.1.2) | - | .M3 | 15.51 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
term.pdf
Tender Documents • 3.74 MB
BOQ_149790.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid