Loading…
Loading…
Tender Value
₹28.1 L
EMD Value
₹56,500
Closing Date
27 Aug 2026, 5:00 pm4d left
EE RMC
RMC
Construction of 09 Seater toilet in nurse colony back side of home guard ground Ward No-39 under RMC (CT)
2026_UDD_117338_8
313/ENG 2026
Open Tender
Civil Works
Works
90 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹56,500
13 Aug 2026
13 Aug 2026
28 Aug 2026
13 Aug 2026
27 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil & disposal of surplus excavated soil as directed, within or outside the site at an unobjectionable place.i) All kinds of Soil | 110.78 | CUM | 151.82 | ₹16,818.84 |
| 2 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 38.62 | CUM | 15.51 | ₹599.02 |
| 3 | Filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5M all complete as per building specification and direction of EA (Mode of | 64.33 | CUM | 55.28 | ₹3,556.21 |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | 0.95 | CUM | 589.51 | ₹562.06 |
| 5 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table
300-2 | 32.32 | Cum | 122 | ₹3,942.43 |
| 6 | Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling12 mm diameter holes and plugging with cement mortar 1 :2(1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos E.C. 20% with 1% concentration | 73.91 | Sqm | 253.14 | ₹18,709.58 |
| 7 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 41.06 | ltr | 191.57 | ₹7,866.08 |
| 8 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 66.22 | sqm | 351.75 | ₹23,292.89 |
| 9 | Providing and laying in position cement concrete of specified grade excluding cost of centering & shuttering. All work up to plinth level:1:4:8(1 Cement :4 Fine Sand : 8 Graded stone aggregate of 40mm) | 1.76 | CUM | 3,751.64 | ₹6,607.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 1.75 MB
BOQ_158585.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].