Tender Value
Refer Docs
Closing Date
20 May 2023, 2:00 pmClosed
EE DWand S Mech Div. Jamshedpur
Office of the EE DWand S Mech Div. Jamshedpur
e- quotation for Annual RM estimate of Adityapur Water Supply Scheme.
2023_DWSD_71054_1
E-Quotation No. 02/2023-24
Open Tender
Pumps/Motors
Item Wise
90 days
Jamshedpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
29 May 2023
13 May 2023
22 May 2023
13 May 2023
20 May 2023
13 May 2023
A) 1ST PHASE RAW WATER SITARAMPUR P/P. ( 60 H.P.V.T P/Set - 3 Nos ) Repairing of 60 H.P,V.T pump dismantling bowl assembly as per required along with loading, unloading & transportation charge all complete.
Cost towards rewinding of 60 H.P.V.T Motor with suitable copper wire (32 Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloading transportation charge all complete.
Cost towards supplying and fitting thrust bearing SKF 7320 and 6311 - 2z for 60 H.P.V.T Motor and proper greass etc. all complete
Cost towards Supplying making & fitting S.S line shaft size 56 mm x 7'2" long of N - 304 materials, G.M impeller for 3 stage 60 H.P.V.T pump as per size and sample, G.M bush, S.S line shaft , 8" dia M.S Spider bearing with rubber cut less bush etc. all complete
Cost towards repairing & rewinding of 315 1/0.4 KV Step down Transformer with Suitable Size DPC Copper wire (14.7 Kg. per Coil) Varnishing with best Quality Air drying Vanish heating and repairing all required joints including the cost of all required materials Such as DPC Copper wire, Varnishing insulating, stud, transformer Oil materials, rubberized Corrugated Sheet nuts, bolts, washer etc. and doing internal wiring Properly with all labour
Cost towards repairing and overhauling of 400 A OCB make MEI taking out damaged spare parts then replacing with all complete
Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacement by new one like chain pulley block, stud nuts & bolts and gear all complete.
Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket, washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete.
Cost towards repairing of 8" dia N.R Valve, sluice Valve, suction pipe, bend, Hyder taking out damaged spare parts like nut bolts, spindle, washer etc then fitting by new one including the cost of machining turning & finishing all complete.
Cost towards Supplying and Laying 25 mm² x 3 Core PVC insulated Copper cable 1.1 KV grade with ISI Mark
Cost towards repairing & rewinding of 150 KVA 1/0.4 KV Step down Transformer with Suitable Size DPC Copper wire (14.7 Kg. per Coil) Varnishing with best Quality Air drying Vanish heating and repairing all required joints including the cost of all required materials Such as DPC Copper wire, Varnishing insulating, stud, transformer Oil materials, rubberized Corrugated Sheet nuts, bolts, washer etc. and doing internal wiring Properly with all labour
(B) 2ND PHASE RAW WATER SITARAMPUR P/P. ( 100 H.P C/F Pump set - 2 Nos and 90 H.P C/F Pump set - 1 No. ) Dismantling of 90 H.P - 1 Set and 100 H.P - 2 Sets Centrifugal Pump and taken out damaged impeller etc. all Complete
Cost towards repairing and rewinding of 90 H.P.V and 100 H.P Sq. Cage induction motor 3 Phase, 50 Cycles 1440 RPM 415 ± 10% Volts with Super enameled Copper wire (34 Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloading transportation charge all complete.
Cost towards Supplying and fitting SKF N – 316 Roller bearing (for D.E & NDE Side of the motor) and 6318-C & 6309 Ball bearing for DE & DE side of the pump grease, jute etc all complete
Cost towards repairing and overhauling of 630 A VCB make ABB, taking out damaged spare parts then replacing by new one like Ratchet assembly, flush mounting type triple pole, fixed contact, moving contact, Arc shield motor and mounting type of relay etc. all complete.
Cost towards repairing of 6" dia N.R Valve, sluice Valve, 8" dia foot valve, suction pipe, bend, Hyder taking out damaged spare parts like nut bolts, spindle, washer etc then fitting by new one including the cost of machining turning & finishing all complete.
Cost towards repairing of G.M Shaft bush, Neck ring, G.M Impeller, Tyre Coupling set, Gland Tightner bearing housing for Proper Size making and machining and finishing for proper bearing fitting.
Cost towards repairing & rewinding of 315 KVA 1/0.4 KV Step down Transformer replacing burnt coil studs, transformer oil (300 lits.) insulator, lightening Arrestor, with loading, unloading & transportation charge all complete.
Cost towards repairing of FASD Starter 2 Nos Oil immersed Star Delta Starter - 1 No. replacing conductor, relay, timer and suitable contact finger.
Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacement by new one like chain pulley, stud nuts & bolts and gear all complete.
Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket, washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete.
Cost towards Supplying and Laying 35 mm² x 3 Core PVC insulated Copper cable 1.1 KV grade with ISI Mark
(C) 1ST PHASE CLEAR WATER SITARAMPUR P/P. (125 H.P C/F Pump set - 1 No,120 H.P C/F Pump set - 1 No. 100 H.P C/F Pump set - 2 Nos and 90 H.P C/F Pump set - 1 No. ) Dismantling of the 125 H.P, 100 H.P - 2 Sets, 120 H.P, 90 H.P induction motor from discharge head and taken out rotor from Stator etc. all Complete
Cost towards rewinding of 125 H.P, 100 H.P - 2 Sets, 120 H.P, 90 H.P induction Motor with suitable copper wire (36+ 34+34+ 34+32) Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloading transportation charge all complete
Cost towards repairing of 6" dia N.R Valve, sluice Valve, 6" dia foot valve, suction pipe, bend, Hyder taking out damaged spare parts like nut bolts, spindle, washer etc then fitting by new one including the cost of machining turning & finishing all complete.
Cost towards Supplying and fitting SKF N – 316 Roller bearing (for D.E & NDE Side of the motor) and 6318 - C & 6309 Ball bearing, for DE & DE side of the pump grease, jute etc all complete
Cost towards repairing of G.M Shaft bush, Neck ring, G.M Impeller, Tyre Coupling set, Gland Titner, bearing housing for Proper Size making and machining and finishing for proper bearing fitting.
Cost towards repairing & rewinding of 315 KVA 1/0.4 KV Step down Transformer replacing burnt coil studs, transformer oil (300 lits.) insulator, lightening Arrestor, with loading, unloading & transportation charge all complete.
Cost towards repairing and overhauling of 630 A VCB make ABB taking out damaged spare parts then replacing by new one like Ratchet assembly, flush mounting type triple pole, fixed contact, moving contact, Arc shield motor and mounting type of relay etc. all complete.
Cost towards repairing of FASD Starter 3 Nos Oil immersed Star Delta Starter - 2 No. replacing conductor, relay. timer and suitable contact finger
Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacement by new one like chain pulley, stud nuts & bolts and gear all complete.
Cost towards repairing and overhauling of 400 A OCB make MEI, taking out damaged spare parts then replacing with all complete
Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket, washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete.
Cost towards S/F 90 mm² x 3 Core Copper Cable with ISI mark.
(D) 2ND PHASE CLEAR WATER SITARAMPUR P/P. ( 100 H.P C/F Pump set - 3 Nos ) Dismantling of 100 H.P Centrifugal Pump and taken out damaged impeller etc. all Complete
Cost towards repairing and rewinding of 100 H.P Sq. Cage induction motor 3 Phase, 50 Cycles 1440 RPM 415 ± 10% Volts with Super enameled Copper wire (34 Kgs x 3) and replacing of spare materials like bearing nut bolts as per required with loading, unloading transportation charge all complete.
Cost towards Supplying and fitting SKF N – 316 Roller bearing (for D.E & NDE Side of the motor) and 6309 & 6318- C Ball bearing for DE & DE side of the pump grease, jute etc all complete
Cost towards repairing of 6" dia N.R Valve, sluice Valve, 6" dia foot valve, suction pipe, bend, Hyder taking out damaged spare parts like nut bolts, spindle, washer etc then fitting by new one including the cost of machining turning & finishing all complete.
Cost towards repairing of G.M Shaft bush, . neck ring, G.M Impeller, Tyre Coupling set, Gland Titner, bearing housing for Proper Size making and machining and finishing for proper bearing fitting.
Cost towards repairing & rewinding of 250 KVA 1/0.4 KV Step down Transformer replacing burnt coil studs, transformer oil (300 lits.) insulator, lightening Arrestor, with loading, unloading & transportation charge all complete.
Cost towards repairing and overhauling of 630 A VCB make ABB, taking out damaged spare parts then replacing by new one like Ratchet assembly, flush mounting type triple pole, fixed contact, moving contact, Arc shield motor and mounting type of relay etc. all complete.
Cost towards repairing of FASD Starter 2 Nos Oil immersed Star Delta Starter - 1 No. replacing conductor, relay and suitable contact finger
Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacement by new one like chain pulley, stud nuts & bolts and gear all complete.
Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket, washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete.
Cost towards Supplying and Laying 300 mm² x 3½ Core PVC insulated Armored Aluminum cable 1.1 KV grade with ISI Mark
(E)BHUA RAW WATER P/P. ( 125 H.P.V.T Pump set - 3 Nos ) Repairing of 125 H.P,V.T - 3 Sets replacing bowl assembly as per required along with loading, unloading & transportation charge all complete.
Cost towards rewinding of 125 H.P.V.T Motor with suitable copper wire (42 Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloading transportation charge all complete.
Cost towards supplying and fitting thrust bearing SKF 7320 for 60 H.P.V.T Motor and proper greases etc. all complete
Cost towards repairing & rewinding of 315 KVA 1/0.4 KV Step down Transformer replacing burnt coil studs, transformer oil (300 lits.) insulator, lightening Arrestor, with loading, unloading & transportation charge all complete.
Cost towards repairing and overhauling of 630 A VCB make ABB, taking out damaged spare parts then replacement by new one like Ratchet assembly, flush mounting type triple pole, fixed contact, moving contact, Arc shield motor and mounting type of relay etc. all complete.
Cost towards repairing and over hauling of 3 Tonne chain pulley block, taken out its damaged spare parts then replacement by new one like chain, stud nuts & bolts and gear all complete.
Cost towards Making raw materials and supplying and fitting S.S line shaft size 56 mm x 7'2" long of N - 304 materials, G.M impeller for 3 stage 60 H.P.V.T pump as per size and sample, G.M bush, S.S line shaft , 8" dia M.S Spider bearing with rubber cut less bush etc. all complete
Cost towards repairing of 8" dia N.R Valve, sluice Valve, suction pipe, bend, Hyder taking out damaged spare parts like nut bolts, spindle, washer etc then fitting by new one including the cost of machining turning & finishing all complete.
Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket, washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete.
(F) GAMHARIA PANI TANKI P/P, ( 40 H.P C/F Pump set - 2 Nos ) Dismantling of the 40 H.P - 2 Sets, induction motor from foundation head and taken out rotor from Stator etc. all Complete
Cost towards rewinding of 40 H.P - 2 Sets, induction Motor with suitable copper wire (24 x 2 Kgs) and replacing of spare materials like bearing nut bolts as per required with loading, unloading transportation charge all complete
Cost towards repairing of 4" dia N.R Valve, sluice Valve, 6" dia foot valve, suction pipe, bend, Hyder taking out damaged spare parts like nut bolts, spindle, washer etc then fitting by new one including the cost of machining turning & finishing all complete.
Cost towards repairing and replacement of G.M Shaft bush, neck ring, G.M Impeller, Tyre Coupling set, Gland Tightner, bearing housing for Proper Size making and machining and finishing for proper bearing fitting.
Cost towards Supplying and fitting SKF 6306 ball bearing (for D.E & NDE Side of the motor) and Ball bearing, greases, jute etc all complete
Cost towards repairing and over hauling of 2 Tonne chain pulley block, taken out its damaged spare parts then replacement by new one like chain pulley, stud nuts & bolts and gear all complete.
Cost towards repairing of FASD Starter 2 Nos replacing conductor, relay and suitable contact finger
Cost towards repairing of panel board replace by new one like MCCB, Cable, Socket, washer, Nuts & bolts, Amp. Meter, Volt Meter etc all complete.
(G) S/F consumable materials like grease, gland packing, jute, diesel etc. with replacing lighting equipments like bulb, holder, fuse wire human safety equipments like safety shoes, safety gloves, goggles, Aparan mats etc. all complete ( For 1st & 2nd Phase C/W and 1st & 2nd Phase R/W)
Z. K. AND SONS
M/S Anna Traders and Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .