Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC 33 PEMANTLE STREET KOLKATA 700016 | KOLKATA | KOLKATA | WEST BENGAL | 700016 | ₹4.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹4.4 LRejected-Finance | ₹4.4 L | L2 | Rejected-Finance Higher Bid |
| 3 | L3₹4.7 LRejected-Finance NICHUPATTY BOLPUR BIRBHUM | BIRBHUM | WEST BENGAL | 713129 | ₹4.7 L | L3 | Rejected-Finance Higher Bid |
| 4 | L4₹4.7 LRejected-Finance 56 C 2 BIDHAN NAGAR ROAD ULTADANGA KOLKATA 700067 | KOLKATA | KOLKATA | WEST BENGAL | 700067 | ₹4.7 L | L4 | Rejected-Finance Higher Bid |
| Sl No | Description | Qty | Unit | MILLENNIUM AIRCON L1 | BANERJEE ENTERPRISE L4 | MOON LIGHT L3 | DIAMOND ELECTRIC SALE AND SERVICE L2 |
|---|---|---|---|---|---|---|---|
| 1.00Charges of one calendar month for routine Inspection of each machine in every forth night, complete repair and maintenance of AC machine(both IDU & ODU including supply & fixing of spare parts including compressor & Gas in place of damages one by the company’s own tools & tackles & as per attached terms & condition and as per direction of EIC. Charges inclusive with less cost of dismantled material. The maintenance will cover replacement of all type of damages spare parts. No extra payment would be made for the machine. | |||||||
| 1.01 | 1.5 Ton
Total No. of machine = 13
Maintenance period = 12 Months
Quantity =1.5x13 = 19.5
Rate should be quoted per machine per month basis | 19.5 | Ton | 200 ₹3,900 | 110 ₹2,145 | 140 ₹2,730 | 100 ₹1,950 |
| 1.02 | 2 Ton
Total No. of machine = 43
Maintenance period = 12 Months
Quantity =2x 43 = 86
Rate should be quoted per machine per month basis | 86 | Ton | 175 ₹15,050 | 175 ₹15,050 | 160 ₹13,760 | 165 ₹14,190 |
| 1.03 | 5 Ton
Total No. of machine = 7
Maintenance period = 12 Months
Quantity = 5x7 = 35
Rate should be quoted per machine per month basis | 35 | Ton | 75 ₹2,625 | 190 ₹6,650 | 200 ₹7,000 | 180 ₹6,300 |
| 1.04 | 7.5 Ton
Total No. of machine = 2
Maintenance period = 12 Months
Quantity =7.5x 2 = 15
Rate should be quoted per machine per month basis | 15 | Ton | 75 ₹1,125 | 200 ₹3,000 | 205 ₹3,075 | 190 ₹2,850 |
| 1.05 | 8.5 Ton
Total No. of machine = 4
Maintenance period = 12 Months
Quantity =8.5x 4 =34
Rate should be quoted per machine per month basis | 34 | Ton | 250 ₹8,500 | 210 ₹7,140 | 205 ₹6,970 | 200 ₹6,800 |
| 1.06 | 11 Ton
Total No. of machine = 2
Maintenance period = 12 Months
Quantity =11x 2 = 22
Rate should be quoted per machine per month basis | 22 | Ton | 250 ₹5,500 | 230 ₹5,060 | 245 ₹5,390 | 210 ₹4,620 |
| 1.07Note 1: comprehensive mtc. Will cover replecement of all spare parts including compressor in place of damage or unserviceable spare parts. Note 2: Queted rate per machine should be inclusive of spare parts manpowar, whole time manpower and taxas duties etc. Note 3: Maintance of above AC machine should be maintain following the annex terms & condition which is integral part of this BOQ. Additionally, the agency is required to provide a full-time semi-skilled AC technician daily from 10:00 am to 6:00 pm for attending emergency calls from the authority, as well as for routine checks and maintenance. Note 4: In case of the absence of manpower, the rate per hour or per day should be deducted from the bill according to the minimum labor wages as of the tender date. Note 5: Failure to adhere to each scheduled servicing will be considered as failed to attended servicing and will incur a deduction of twice the quoted rate per servicing from the bill. Note 6: Locationwise allocation of ac machine will be provided at the time of layout. | |||||||
Tender Value
Refer Docs
EMD Value
₹9,400
Closing Date
14 Jul 2025, 1:00 pmClosed
Executive Engineer Cooch Behar Elec. Division
Executive Engineer Cooch Behar Elec. Division
WBPWD/EE/CED/e-NIQ-14/2025-26
2025_WBPWD_870177_1
WBPWD/EE/CED/e-NIQ-14/2025-26
Open Tender
ELECTRICAL WORKS M/R
365 days
Mathabhanga
Please refer tender documents
7 documents required · 7 mandatory
₹9,400
Yes
5 Jun 2026
25 Jun 2025
16 Jul 2025
25 Jun 2025
14 Jul 2025
25 Jun 2025
Amount
Charges of one calendar month for routine Inspection of each machine in every forth night, complete repair and maintenance of AC machine(both IDU & ODU including supply & fixing of spare parts including compressor & Gas in place of damages one by the company’s own tools & tackles & as per attached terms & condition and as per direction of EIC. Charges inclusive with less cost of dismantled material. The maintenance will cover replacement of all type of damages spare parts. No extra payment would be made for the machine.
1.5 Ton Total No. of machine = 13 Maintenance period = 12 Months Quantity =1.5x13 = 19.5 Rate should be quoted per machine per month basis
2 Ton Total No. of machine = 43 Maintenance period = 12 Months Quantity =2x 43 = 86 Rate should be quoted per machine per month basis
5 Ton Total No. of machine = 7 Maintenance period = 12 Months Quantity = 5x7 = 35 Rate should be quoted per machine per month basis
7.5 Ton Total No. of machine = 2 Maintenance period = 12 Months Quantity =7.5x 2 = 15 Rate should be quoted per machine per month basis
8.5 Ton Total No. of machine = 4 Maintenance period = 12 Months Quantity =8.5x 4 =34 Rate should be quoted per machine per month basis
11 Ton Total No. of machine = 2 Maintenance period = 12 Months Quantity =11x 2 = 22 Rate should be quoted per machine per month basis
DIAMOND ELECTRIC SALE AND SERVICE (BID ID -6711762)
MOON LIGHT (BID ID -6709511)
BANERJEE ENTERPRISE (BID ID -6715005)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid