| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.4 L+₹48,131.80 (12.2%)Rejected-Finance SHIMLA DIVISION NO I HIMACHAL PRADESH HP | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹5.6 L+₹1.6 L (41.6%)Rejected-Finance | L3 | Rejected-Finance Rejected |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
11 Aug 2023, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Construction of drain from Dispensary Sanjauli chowk to Rukmani Niwas RD 0 0 to 0 120 in ward No 18
2023_MC_77119_20
1539Dated27072023
Open Tender
Civil Works
Item Rate
30 days
Shimla
Please refer Tender Documents
7 documents required · 7 mandatory
₹350
Executive Engineer R B M C Shimla
₹9,000
19 Sept 2023
4 Aug 2023
14 Aug 2023
4 Aug 2023
11 Aug 2023
4 Aug 2023
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge. Nominal concrete 1:3:6
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for :Columns, piers, abutments, pillars, posts and struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).
P/L Polished Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Light shade pigment using white cement 50% Grey & 50% Red
Providing and fixing M.S tiles 8mm thick sheet half round 9''dia i/c M.S sheet collar of 93/4 dia i/c priming coat approximate weight 50 kg /1.80 metre length.
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
NEERAJ KUMAR
Durgesh Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .