Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82,225.55Accepted-AOC | ₹82,225.55 | L1 | Accepted-AOC Lowest amount |
| 2 | L2₹82,402.88Rejected-AOC | ₹82,402.88 | L2 | Rejected-AOC Highest amount |
| Sl No | Description | Qty | Unit | Jegathambigai L1 | C S & CO L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring and strutting and balling out water wherever necessary refilling the sides of foundation with excavated earth in layers of not more complete complying with standard specification | 17.13 | m3 | 246 ₹4,213.98 | 247 ₹4,231.11 |
| 2.00 | Plain Cement concrete 1:4:8 mix(one cement ,four sand and eight aggregate) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, consolidating and curing etc., complete as per standard specification. | 0.6 | m3 | 5,115 ₹3,069 | 5,121 ₹3,072.60 |
| 3.00 | P.C.C. 1:3:6 cement concrete (one cement three sand and six hard broken stone) using 20mm guage hard broken granite stone jelly for flooring including consolidating as per standard specification curing, etc., complete and rendering the top rough to take floor finish. The rate is to include necessary as directed by the departmental officers. | 4.29 | m3 | 5,842 ₹25,062.18 | 5,849 ₹25,092.21 |
| 4.00 | Re-filling the excavation earth filing including cost and conveyance of all materials to site and all labour charges etc complete as per standard specification. | 17.13 | m3 | 43 ₹736.59 | 43 ₹736.59 |
| 5.00 | Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00M in height including cost and conveyance of all materials to site and all labour charges etc complete | 10.42 | m2 | 493 ₹5,137.06 | 494 ₹5,147.48 |
| 6.00 | Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod including cost and conveyance of all materials to site all labour charges etc complete as per standard specification. | 53.6 | Kg | 90 ₹4,824 | 90 ₹4,824 |
| 7.00 | Reinforced cement concrete 1:1 1/2 :3mix (for M20 grade concrete) using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. | 0.67 | m3 | 8,102 ₹5,428.34 | 8,111 ₹5,434.37 |
| 8.00 | Plastering with cement mortar 1:5 mix (One cement and five sand) to 12mm thick including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 10.56 | m2 | 267 ₹2,819.52 | 268 ₹2,830.08 |
| 9.00 | Painting two coats with Emulsion Paint over plastered wall surface including cost and conveyance of all materials to site and all labour charges etc complete. | 10.56 | m2 | 248 ₹2,618.88 | 249 ₹2,629.44 |
| 10.00 | Supply and fixing of PVC 6ksc& GI"B' class pipe from approved company and including cost and conveyance of materials and all etc complete complying with std specifications a)50mm GI 'B' Class pipe | 10 | m | 463 ₹4,630 | 464 ₹4,640 |
Tender Value
₹1.0 L
EMD Value
₹2,020
Closing Date
17 Mar 2026, 3:00 pmClosed
Executive Officer
Executive officer Sangaramanallur Town panchayat
Erode Zone Tiruppur District Sangaramanallur Town panchayat MLA CDS 2025 2026 Construction of Syntex tank 2000 litre bed at ward no09 PD Shop near and shop no3 near Samathuvapuram in Sangaramanallur Town Panchaya of Tiruppur District
2026_DTP_674133_1
51/2025
Open Tender
Civil Works
Sangaramanallur Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,020
18 May 2026
13 Mar 2026
17 Mar 2026
13 Mar 2026
17 Mar 2026
13 Mar 2026
Earth work excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring and strutting and balling out water wherever necessary refilling the sides of foundation with excavated earth in layers of not more complete complying with standard specification
Plain Cement concrete 1:4:8 mix(one cement ,four sand and eight aggregate) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, consolidating and curing etc., complete as per standard specification.
P.C.C. 1:3:6 cement concrete (one cement three sand and six hard broken stone) using 20mm guage hard broken granite stone jelly for flooring including consolidating as per standard specification curing, etc., complete and rendering the top rough to take floor finish. The rate is to include necessary as directed by the departmental officers.
Re-filling the excavation earth filing including cost and conveyance of all materials to site and all labour charges etc complete as per standard specification.
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00M in height including cost and conveyance of all materials to site and all labour charges etc complete
Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod including cost and conveyance of all materials to site all labour charges etc complete as per standard specification.
Reinforced cement concrete 1:1 1/2 :3mix (for M20 grade concrete) using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Plastering with cement mortar 1:5 mix (One cement and five sand) to 12mm thick including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Painting two coats with Emulsion Paint over plastered wall surface including cost and conveyance of all materials to site and all labour charges etc complete.
Supply and fixing of PVC 6ksc& GI"B' class pipe from approved company and including cost and conveyance of materials and all etc complete complying with std specifications a)50mm GI 'B' Class pipe
b)63mm pvc 6ksc pipe
Conveyance and lowering of following PVC 6ksc pipe&GI pipe and specials into trenches and laying and jointing with cutting and threading to grade and alignment including charges for testing of pipe line with water after the pipes are laid and jointed etc.,complete complying with std specifications a)50mm GI 'B' Class pipe
b)63mm pvc 6ksc pipe
Supply and fixing of 2000 lit HDPE Tank ISI make with all accessories such as Tank Nipple, Washer etc., including cost and conveyance of all materials to site etc., complete as per standard specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_810288.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid